Site work for a water / sewer project in Pickerington, Ohio. Completed plans call for site work for a water / sewer project.

The Engineer's opinion of probable construction cost is $2,590,656.00 as of January 2024. Documents Notes : Bidding Documents may be downloaded from the designated website. Prospective Bidders are encouraged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. The Project includes the following Work: Construction of a new 6,300 lineal foot 14inch diameter sanitary force main beginning at the Valley Lift Station and ending at the Tussing Road Water Reclamation Facility (WRF) property. Horizontal directional drilling (HDD) construction methods will be utilized for all roadway crossings and two stream crossings (see Drawings). An existing 8inch and 10 inch diameter force main (not in service) will be removed during some portions of the open cut alignment. Other improvements at the Valley Lift Station site include new 14inch diameter force main piping, new 8inch diameter headers that extend out of the valve vault, two camlock connections, six gate valves and boxes, a new meter vault, and connecting the new 14inch force main to the existing 12 inch force main in service. The new meter vault will be a 6foot by 8foot precast concrete structure approximately 3 feet above grade and will include a sump pump and safety features. Power at the main control panel will be rerouted to the new meter vault to supply power to the flow meter and sump pump. The existing meter vault at the lift station site will be demolished. Bypass pumping will be required during part of the project.

Post-Bid

Water / Sewer

$2,590,656.00

Public - County

Site Work

30

18

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
39
Bidding Soon
870
All Active Projects
364
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

April 29, 2024

img_map_placeholder

1550 Hill Rd N, Pickerington, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.