BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2024 at 8:00 PM

Updated March 29, 2024

Renovation of a water / sewer project in Sunrise, Florida. Completed plans call for the renovation of a water / sewer project.

The Work generally includes Permitting and Construction. Project includes, but is not limited to, providing all labor, equipment, materials, and services to perform the repair work as shown on the drawings and specifications, and as described herein. The Project generally consists of the repair of structural concrete building components and surfaces exposed to waste water, treatment chemicals and moisture, resulting in delamination from reinforcing steel corrosion (spalling), cracking, and surface deterioration. Work is located in the City of Sunrise at 14150 NW 8th Street, Sunrise, FL 33325 and 4350 Springtree Drive, Sunrise, FL 33351Qualification Requirement: The Contractor shall have any of the following: Florida Certified General Contractor's License OR Florida Certified Specialty Contractor's License. The Contractor must have worked on 3 projects over the past 5 years of similar size and scope. The City shall be the sole and final judge in determining if the Contractor meets the Qualification Requirement In compliance with the ADA and F.S.S. 286.26, any individual with a disability requesting a reasonable accommodation in order to participate in a public meeting should contact the Citys ADA Coordinator at least 48 hours in advance of the scheduled meeting. Requests can be directed via e-mail to hr@sunrisefl.gov or via telephone to (954) 838-4522; Florida Relay: 711; Florida Relay (TIY/VCO): 1-800-955-8771; Florida Relay (Voice): 1-800-955- 8770. Scope of Work: The Sawgrass Wastewater Treatment consists of two aeration trains A & B and four clarification tanks per train. The Springtree Wastewater Treatment consists of four clarification tanks and an aeration tank. The tanks at both plants are connected by a steel bridge/catwalk that can be accessed from the ground. The Work generally includes Permitting and Construction. Project includes, but is not limited to, providing all labor, equipment, materials, and services to perform the repair work as shown on the drawings and specifications, and as described herein. The Project generally consists of the repair of structural concrete building components and surfaces exposed to waste water, treatment chemicals and moisture, resulting in delamination from reinforcing steel corrosion (spalling), cracking, and surface deterioration. Refer to construction documents overall scope of work. Location: Work is located in the City of Sunrise at 14150 NW 8th Street, Sunrise, FL 33325 and 4350 Springtree Drive, Sunrise, FL 33351 The Contractor shall achieve Substantial Completion of the Work no later than Two Hundred and Forty (240) calendar days after the Notice to Proceed Date. The number of calendar days from the Notice to Proceed Date, through the date set forth for Substantial Completion, shall constitute the Contract Time. The Contractor shall furthermore achieve Final Completion of the Work no later than Thirty (30) calendar days after date of Substantial Completion.

Bid Results

Water / Sewer

$753,281.00

Public - City

Renovation

17

7

8

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
117
Bidding Soon
1,812
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2024

April 15, 2024

Project location map

Multiple Locations, Sunrise, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.