BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Kingsburg, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Frontage Road Drainage Repairs. Inquiries regarding this project should be directed to William Washburn, Project Engineer at wwashburn@peters-engineering.com. Oral explanations or interpretations of plans and specifications are not binding. Any explanation, interpretation or clarification of plans and specifications will be in the form of a written addendum to the plans and specifications issued to plan holders of record. Bid security in the amount of then (10) percent of the amount of the bid, and in the form of a bid bond issued by an admitted surety insurer licensed by the California Department of Insurance, cash, cashier's check or certified check shall accompany the bid. Bid security shall be made in favor of the City of Kingsburg. The successful bidder shall furnish a faithful performance bond in the amount of 100 percent of the contract amount and a payment bond in the amount of 100 percent of the contract amount. Said bonds shall be issued by a surety company who is an admitted surety insurer authorized by the California Department of Insurance to transact business in this state, and acceptable to the City of Kingsburg. Bidders are cautioned that representations made by surety companies will be verified with the California Department of Insurance and that the City of Kingsburg will not accept a surety company with a Best's rating of less than B. The City Council reserves the right to reject any or all bids. BEGINNING OF WORK, TIME OF COMPLETION, LIQUIDATED DAMAGES Attention is directed to the provisions in Section 8-1.04 "Start of Job Site Activities," to Section 8-1.05 "Time of Completion," and to Section 8-1.10 "Liquidated Damages" of the Standard Specifications and these Special Provisions. A preconstruction conference shall be held within 10 calendar days of contract award after which a Notice to Proceed will be immediately issued. The Contractor shall begin work within 10 days after receiving a Notice to Proceed by the City of Kingsburg and shall diligently prosecute the same to completion before the expiration of 20 WORKING DAYS from the date shown in said Notice to Proceed. The Contractor shall pay to the City of Kingsburg the sum of ONE THOUSAND DOLLARS ($1,000.00) per day for calendar each and every calendar day's delay in finishing the work in excess of the number of working days prescribed above. The Contractor shall not be assessed liquidated damages for delay in completion of the projects, when such delay was caused by the failure of the City of Kingsburg or the owner of the utility to provide for removal or relocation of the existing utility facilities. The work to be done consists, in general, includes hot mix asphalt, earthwork and grading, preparation of subgrade, construction of corrugated metal pipe and hot mix asphalt dike type 'A'. Inquiries regarding this project should be directed to William Washburn, Project Engineer at wwashburn@peters-engineering.com. Oral explanations or interpretations of plans and specifications are not binding. Any explanation, interpretation or clarification of plans and specifications will be in the form of a written addendum to the plans and specifications issued to planholders of record.

Award

Water / Sewer

$340,130.00

Public - City

Paving, Site Work

5

6

4

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
15
Bidding Soon
347
All Active Projects
121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2024

March 14, 2024

img_map_placeholder

Frontage Rd, Kingsburg, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.