BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2024 at 8:00 PM

Updated March 23, 2024

Site work for a civil project in Millen, Georgia. Completed plans call for site work for a road / highway; and water / sewer project.

Per engineer bids came in way over budget unsure if they will award. SCOPE OF WORK The work shall consist of furnishing al products and equipment and performing all labor necessary to perform the following: The work to be done shall consist of providing al materials and performing al labor necessary to erect and place into service a 500,000 gallon elevated water storage tank, constructed of welded steel with torus bottom supported by six (6) column support legs. Work shall include miscellaneous site work, grading, yard piping, fencing, erosion and sediment control measures, foundation work, painting complete with appurtenances. Time allotted for completion of work is Two hundred ten (210) calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Owner reserves the right to reject any or all Bids and to waive informalities, including without limitation, the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

1

1

21

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
61
Bidding Soon
741
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

May 28, 2024

Project location map

US-25, Millen, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.