BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in San Jacinto, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of March 29, 2024, This project has been awarded to American Asphalt South, Inc., with the awarded amount of $2,495,489.60.** The project's general work occurs in twenty-four physically separated locations. The twenty-four locations shown in the plans will require some methods of maintenance. The plans for all the different zones of this project consist of laying down slurry seal, grind and overlay of asphalt concrete, full depth removal and replacement of asphalt concrete and aggregate base, and the removal and replacement of damaged concrete sidewalks, curbs and gutters. As part of the work the Contractor shall furnish all labor, technical and professional services, supervision, materials, equipment, tools, and incidentals as required by the Plans, Specifications, and Contract Documents. Bid Valid $1,700,000 Liquidated Damages $1,000 per Day Estimated Bid Value $1,700,000 Start/Delivery Date April 8, 2024 Project Duration 90 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 02/19/2024 5:00 PM (PST) LICENSING REQUIREMENTS. All bidders shall be licensed in accordance with provisions of the Business and Professions Code and shall possess a State of California Contractor's license, Class A or appropriate license per State of California, at the time of contract award. The successful Contractor and its subcontractors will be required to possess business licenses from the City. COMPLETION OF WORK. The work is expected to start by April 8, 2024. All Base work shall be completed in its entirety within 90 working days from said date. GUARANTEE Each bid shall be made on the proposal form furnished by the City on the Planet Bids website and shall be in accordance with the Plans, Specifications, and Contract Documents and shall be accompanied by a certified check, cashier's check, or bidder's bond, payable to the City in a sum not less than ten percent (10%) of the amount of the bid, as a guarantee that the bidder will enter into the contract for the work, the full amount of such guarantee to be forfeited to the City should said bidder fail to enter into said Contract. The successful bidder will be required to furnish a Faithful Performance Bond in the amount of not less than one hundred percent (100%) of the contract price, and a Labor and Materials Bond in an amount of not less than one hundred percent (100%) of the contract price, said bonds to be underwritten by sureties qualified to do business in the State of California, preferable carrying a rating of A or better, in the current edition of Bests Insurance Guide. CITY'S RIGHTS RESERVED. The City reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the City. None of the 3 lowest bidders may withdraw their bid for a period of ninety (90) days after the bid opening. RECORD RETENTION. Contractor must keep project records for a period of five (5) years after project completion. SCOPE OF WORK. The work to be done consists of furnishing all labor, materials, equipment, tools, and incidentals as required by the Plans, Specifications, and Contract Documents. The general items of work include: The project's general work occurs in twenty-four physically separated locations. The twenty-four locations shown in the plans will require some methods of maintenance. The plans for all the different zones of this project consist of laying down slurry seal, grind and overlay of asphalt concrete, full depth removal and replacement of asphalt concrete and aggregate base, and the removal and replacement of damaged concrete sidewalks, curbs and gutters. As part of the work the Contractor shall furnish all labor, technical and professional services, supervision, materials, equipment, tools, and incidentals as required by the Plans, Specifications, and Contract Documents. No overnight closures will be allowed. Access to existing homes, schools and businesses shall be maintained at all times. Sewer service to existing homes, schools and businesses shall be maintained at all times.

Award

Roads / Highways

$2,495,490.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
499
Active Projects
225
Bidding Soon
3,276
All Active Projects
1,476
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 6, 2024

April 12, 2024

August 16, 2024

img_map_placeholder

Multiple Locations, San Jacinto, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.