Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 10, 2025 at 8:00 PM
Updated July 11, 2025
Site work and paving for a mixed-use development in Woodstock, Georgia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.
PLEASE NOTE: The estimated project value is for searchability purposes only and may not reflect the full value of the project. The City of Woodstock, Georgia, herein referred to as the City, is accepting proposals from qualified contractors for the purpose of constructing the Little River Park located at 3193 Trickum Road, 3195 Trickum Road and 25 Celandine Road Woodstock, GA 30188, herein referred to as the project. This project is comprised of two (2) phases. Phase one (1) includes the new construction of a multi-use trailway along the Linear Corridor and renovations to the existing Woodlands Park. This phase of work includes the installation of a multi-use trailway, wooden boardwalks, boardwalk bridges, prefabricated pedestrian bridges, site furnishings, a pre-engineered restroom structure, pre-engineered pavilions, a dog park and supporting infrastructure improvements. Additionally, this phase includes the renovation of an existing parking area and open space fields. Phase two (2) includes the new construction of park facilities at Trickum Road. This phase of work includes the installation of a multi-use trailway, wooden boardwalks, site furnishings, pre-engineered restroom structures, pre-engineered pavilions, a prefabricated fishing platform, a prefabricated kayak launch, a playground, a nature trail and supporting infrastructure. Phase 2 of this project is located adjacent to the Trickum Road at Nocatee Trail Roundabout Project, which is currently under construction and is estimated to be completed in 2026. Due to the on-going roadway construction, the awarded construction firm will be required to construct Phase 1 of the Little River Park first and then, upon completion of the Trickum Road at Nocatee Trail Roundabout Project, construct Phase 2 of the Little River Park. Question Deadline 04/14/2025 at 12:00 PM ET
Award
Playgrounds / Parks / Athletic Fields
$8,075,575.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2025
July 8, 2025
Multiple Locations, Woodstock, GA
Related To This Project
Woodstock, GA
Bid Date: Feb 09 2024
Woodstock, GA
Bid Date: Feb 28 2024
Woodstock, GA
Bid Date: Mar 12 2024
Woodstock, GA
--
Woodstock, GA
Bid Date: Feb 27 2024
Woodstock, GA
Bid Date: Apr 22 2024
Woodstock, GA
Bid Date: Apr 12 2024
Woodstock, GA
Bid Date: Aug 16 2024
Woodstock, GA
Bid Date: Jan 10 2024
Woodstock, GA
Bid Date: Nov 28 2023
Woodstock, GA
Bid Date: Nov 30 2023
Woodstock, GA
Bid Date: Nov 29 2023
Woodstock, GA
Bid Date: Apr 20 2020
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
