BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work and paving for a mixed-use development in Woodstock, Georgia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.

PLEASE NOTE: The estimated project value is for searchability purposes only and may not reflect the full value of the project. The City of Woodstock, Georgia, herein referred to as the City, is accepting proposals from qualified contractors for the purpose of constructing the Little River Park located at 3193 Trickum Road, 3195 Trickum Road and 25 Celandine Road Woodstock, GA 30188, herein referred to as the project. This project is comprised of two (2) phases. Phase one (1) includes the new construction of a multi-use trailway along the Linear Corridor and renovations to the existing Woodlands Park. This phase of work includes the installation of a multi-use trailway, wooden boardwalks, boardwalk bridges, prefabricated pedestrian bridges, site furnishings, a pre-engineered restroom structure, pre-engineered pavilions, a dog park and supporting infrastructure improvements. Additionally, this phase includes the renovation of an existing parking area and open space fields. Phase two (2) includes the new construction of park facilities at Trickum Road. This phase of work includes the installation of a multi-use trailway, wooden boardwalks, site furnishings, pre-engineered restroom structures, pre-engineered pavilions, a prefabricated fishing platform, a prefabricated kayak launch, a playground, a nature trail and supporting infrastructure. Phase 2 of this project is located adjacent to the Trickum Road at Nocatee Trail Roundabout Project, which is currently under construction and is estimated to be completed in 2026. Due to the on-going roadway construction, the awarded construction firm will be required to construct Phase 1 of the Little River Park first and then, upon completion of the Trickum Road at Nocatee Trail Roundabout Project, construct Phase 2 of the Little River Park. Question Deadline 04/14/2025 at 12:00 PM ET

Award

Playgrounds / Parks / Athletic Fields

$8,075,575.00

Public - City

Paving, Site Work

299

20

193

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
317
Active Projects
169
Bidding Soon
2,368
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

July 8, 2025

Project location map

Multiple Locations, Woodstock, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.