Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Waterford, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.
**As of March 25,2024 has not yet been awarded. A timeline for the award has not yet been established.** The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Approximately 25,000 square feet of sidewalk with associated driveway and restoration repairs. Prior to the time and date designated for receipt of Bids, any Bid that has been submitted may be modified or withdrawn via email to kmarkee@waterfordmi.gov. Such notice shall be in writing over the signature of the Bidder. Written confirmation over the signature of the Bidder shall be received, and date - and time-stamped by the receiving party on or before the date and time set for receipt of Bids. A change shall be so worded as not to reveal the amount of the original Bid. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form Bid security shall be furnished in accordance with the Instructions to Bidders. A pre-bid conference will not be held for this project. Bids may also be hand delivered to the City Office prior to the bid opening. The same reference to bid packages as indicated above also applies to bids being hand delivered. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of Contractor's obligations under the Contract. These bonds must remain in effect until one year after the date when final payment becomes due or until completion of the correction period specified in Paragraph 15.08, whichever is later, except as provided otherwise by Laws or Regulations, the terms of a prescribed bond form, the Supplementary Conditions, or other provisions of the Contract. The Work will be substantially complete on or before August 2, 2024, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before August 30, 2024. Substantial Completion: Contractor shall pay Owner $1,000.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $1,000.00 for each day that expires after such time until the Work is completed and ready for final payment. The Project includes the following Work: Intermittent sidewalk replacement from Elizabeth Lake Road to Telegraph Road along M-59. The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Approximately 25,000 square feet of sidewalk with associated driveway and restoration repairs. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Alex Parent, PE - alex.parent@ohm-advisors.com
Award
Sidewalks / Parking Lot
$549,540.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
February 29, 2024
April 1, 2024
August 30, 2024
Highland Rd, Waterford, MI
Related To This Project
Waterford, MI
Bid Date: Feb 21 2024
Waterford, MI
Bid Date: Mar 12 2024
Waterford, MI
Bid Date: Apr 02 2024
Waterford, MI
Bid Date: May 14 2024
Waterford, MI
Bid Date: Jun 12 2024
Waterford, MI
Bid Date: Jul 29 2024
Waterford, MI
Bid Date: Jul 19 2024
Waterford, MI
Bid Date: Jul 09 2024
Waterford, MI
Bid Date: Jan 17 2024
Waterford, MI
Bid Date: Jan 31 2024
Waterford, MI
Bid Date: Feb 08 2024
Waterford, MI
Bid Date: Feb 02 2024
Waterford, MI
Bid Date: Jan 17 2024
Waterford, MI
Bid Date: Jan 17 2024
Waterford, MI
Bid Date: Jan 04 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--