Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2024 at 8:00 PM

Updated November 18, 2025

Demolition, site work and paving for a mixed-use development in Alpharetta, Georgia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for the demolition of a water / sewer project.

The City is accepting bids from qualified contractors to provide all materials, labor, and equipment for the complete construction of the Windward Parkway Drainage Improvements. The scope or work includes but is not limited to, demolition and reconstruction of existing sidewalk, demolition of existing storm sewer system materials, installation of proposed storm sewer system materials (including but not limited to structures, pipe, and bedding), installation of curb and gutter, tree removal, grading, utility re-location, erosion control, traffic control, stabilization of disturbed soils, and related work. The location of work is along the Windward Parkway frontages of 1000, 1005, 2015 and 2025 Compass Pointe Drive, all within the City of Alpharetta. Questions Due Date: Feb 20th 2024, 2:00 PM EST Enter all questions or comments using Opportunity Q&A tab at the Bonfire project web page. Beth can be reached at 678-297-6052 or purchasing@alpharetta.ga.us.

Award

Water / Sewer

$383,506.00

Public - City

Demolition, Paving, Site Work

49

4

6

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
393
Active Projects
198
Bidding Soon
2,354
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

Project location map

Windward Pkwy, Alpharetta, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed