BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Islamorada, Florida. Completed plans call for the renovation of a military facility.

Question Deadline 02/14/2024 at 10:00 AM ET Quotations sent via the US Postal Service or hand delivered should be sent to: Commanding Officer USCG Base Miami Beach (P&C) Attn: Angel Melendez 909 SE 1 st Ave, Room 512 Miami, FL 33131. This combined synopsis/solicitation for construction services prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued. The solicitation number is 30311PR240000006. Applicable North American Industry Classification Standard (NAICS) codes are: 236220 Commercial and Institutional Building Construction This requirement is for a fixed price contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, Best Value. When submitting your proposals, request a price breakdown of the following: a. Cost of materials and equipment b. Cost of labor Contract will be awarded to the vendor who can provide Best value which includes all labor, material, cost and equipment required within the SOW. Cost and Past Performance factors will also be considered when selecting the award. Anticipated award date: 10 business days after close of solicitation, OOA 29 FEB 2024 Quotes are to be received no later than close of business (3 p.m.EST) on 19 Feb 2024 and are to be sent via e-mail to angel.melendez@uscg.mil Quotations sent via the US Postal Service or hand delivered should be sent to: Commanding Officer USCG Base Miami Beach (P&C) Attn: Angel Melendez 909 SE 1st Ave, Room 512 Miami, FL 33131. Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will be issued in FEDBIZOPS (www.fbo.gov). *********Site visit: It is highly recommended and encouraged that interested party's contact MKC Jeremiah Cantrell for a site visit which will be held on Friday Feb 09, 2024 at 10:00AM EST. For scheduling contact Mr. Cantrell via email Jeremiah.S.Cantrell@uscg.milOr via phone at (912) 414-6726. Location of Work: U.S. Coast Guard Station Islamorada 183 Palermo Drive Islamorada, FL 33036 Wage determinations: FL20240022 Dated 01/24/2024 SCOPE OF WORK: Department of Homeland Security United States Coast Guard Scope of Work For Exterior Door and frame and lock Replacement At U.S. Coast Guard Station Islamorada, Florida. 1 General Contracting Guidelines: 1.1: For the execution of this contract, contractor shall provide all labor, parts, and materials not described in this Scope of Work. Government Furnished materials will be outlined in this scope of work and will be defined as GFM. 1.2: Contractor shall make all reports to the Contracting Officer/On site supervisor in regards to progress of the scheduled work log. If there are questions or concerns regarding the scope of work and/or the work log, the contractor shall not proceed further without guidance from the Contracting Officer. 1.3: Contractor shall provide all necessary documentation for all employees (Valid State ID, Drivers Licenses, etc.). As well any vehicle brought on board any Coast Guard/Military Facility shall have valid state registration and insurance. 1.4: Contractor shall execute the contract IAW this Scope of Work. The contractor is not authorized to deviate from this Scope of Work without written authorization from the Contracting Officer. 1.5: Contractor shall execute the contract IAW this Scope of Work. The contractor is not authorized to deviate from this Scope of Work without written authorization from the Contracting Officer. 1.6: Contractor shall execute the contract IAW this Scope of Work. The contractor is not authorized to deviate from this Scope of Work without written authorization from the Contracting Officer. 1.7: The contractor shall provide a list of all employees that will be working on Coast Guard property to the Contracting Officer prior to the scheduled work days. 2 SUBMITTALS AND OUTCOMES 2.1 The Contractor shall submit a work schedule including all milestones immediately following contract award. 2.2 Submit removal and application procedures for all building surfaces. 3 PROJECT PERFORMANCE TIME The contractor must make notification to the Contracting Officer and MKC Cantrell inventory availability and estimate time of arrival for required equipment. 4 LOCATION All work shall take place at: U.S. Coast Guard Station Islamorada 183 Palermo Drive Islamorada, FL 33036 5 POINT OF CONTACT The Government Point of Contact (POC) for this work is Onsite support/supervisor is MKC Jeremiah Cantrell (912)414-6726, Jeremiah.S.Cantrell@uscg.mil. All work shall be coordinated through both POC's to minimize operational impacts to the unit during the execution of the work. 6 LEASE AGREEMENT TERMS N/A 7 WORK PHASING/SCOPE OF WORK Work shall be completed as expeditiously as possible; Contractor shall coordinate with the POC's to coordinate phasing and job sequencing. Contractor shall submit construction schedule for Government review and approval prior to commencing in any work to be performed. 7.1 SCOPE OF WORK A. Contractor will replace exterior doors, frames, auto closures and locks on 3 of the doors, and locks and auto closures on 7 other doors. B. Contractor will install new door frames on main entrance and galley entrance and South Rec Deck doorways. (total of 3 that need new frames). Contractor will also replace the locks and closure devices on all 10 doors. C. Contractor will ensure doors are properly sealed with no gaps in the frame. Contractor will ensure the 3 new doors being installed are glass and impact rated similar to what is currently installed at the unit. D. Contractor will install all new automatic door closure devices on all doors (total of 10). E. Contractor will provide unit with all keys including any control keys used for lock set replacement. F. Contractor will replace all exterior door locks with a 5 button mechanical style lock that the unit must approve of prior to install. 8 AVAILABILITY OF UTILITIES Reasonable amounts of the following utilities will be made available to the Contractor without charge. + Electricity (if available at the job site) + Potable Water + Restroom facilities 9 COORDINATION The Contractor shall coordinate with the POC to minimize interference with Coast Guard operations or personnel. All work shall be coordinated with other trades involved in the project and carefully laid out in advance. 10 CONTRACTOR USE OF PREMESES The Contractor will be working on a Coast Guard operational military installation. Become familiar with and obey installations' fire, traffic, and security regulations. Personnel shall not stray from the immediate area of work nor direct avenues of ingress and egress unless authorized in advance by the Government. 11 LAYDOWN AREA The Contractor will be provided with an uncovered lay-down area in the immediate vicinity of the work. The Contractor shall be responsible for restoring the area to its original condition at the completion of the work. The Contractor shall be responsible for repair of any damage incurred to buildings, vehicles, boats, equipment, or pavement as a result of storage activities. 12 STORM PROTECTION Should warnings of extreme weather (such as high waves, storm surge, wind of gale force) be issued, the Contractor shall take every practicable precaution to minimize danger to personnel, the work and adjacent property. Precautions shall include, but not be limited to, relocating equipment, closing all openings, removing all loose materials, tools exposed locations, and removing or securing fencing, scaffolding and other temporary work. 13 ENVIRONMENTAL PROTECTION All Federal, State and local laws must be strictly adhered to. Demolition and construction debris shall be disposed of at a permitted facility. 14 DELIVERY AND STORAGE Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations. Damaged or defective items/equipment shall be replaced. Location of storage and staging area shall be designated by the POC's. The contractor will be responsible for security of all materials and equipment. 15 RECEIPT OF MATERIALS Shipment of equipment, materials, and supplies shall be addressed to the Contractor - not the Government. The Contractor must be on hand to accept shipments; the Government will not accept shipments. 16 CLEANUP The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials on a daily basis and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpsters. 17 UTILITY OUTAGES Before interrupting or shutting down any utility, make a request for the interruption to the POC's at least two (2) working days before the anticipated interruption. Identify the utility, reason for interruption, proposed time of interruption, and duration of interruption. Do not interrupt utilities until authorized by the POC. 18 SECURITY 18.1 Working Personnel List. The Contractor shall provide the Contracting Officer and Onsite supervisor with a list of names of all personnel who will be working on the site. The Contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site. 18.2 Personnel Identification All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual's driver's license, or a company issued ID. The identification must be laminated, and show facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises. 19 QUALITY Quality of Contractor Furnished Material. Materials supplied by the Contractor shall be of a quality conforming to applicable Federal specifications. 20 WARRANTIES All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government. 21 FINAL INSPECTION AND ACCEPTANCE When the work is complete and ready for final inspection, submit a written request to schedule final inspection to the Government. Prior to such requests, all submittals must be complete and approved. Such requests shall allow a minimum of two (2) days' notice prior to final inspection date. 22 SAFETY 22.1 General The Contractor is solely responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property and avoids work interruptions. The Contractor shall provide appropriate safety measures including, but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules and regulations. 22.2 Compliance The Contractor is specifically required to comply with the requirements of the U. S. Army Corps of Engineers "Safety and Health Requirements Manual" (EM 385-1-1, latest version available) and the "Accident Prevention" clause (FAR 52.236-13). Once accepted, this safety plan shall become part of the contract requirements. Note: This review/acceptance does not in any way relinquish the Contractor from responsibility for work site safety nor the obligation to comply with the OSHA regulations found in 29 CFR 1910 & 1926 or any other State or Local safety law, rule or regulation applicable to the contract work. The Coast Guard will cooperate fully with the Department of Labor (Occupational Safety and Health Administration) in their enforcement of OSHA regulations. 22.3 Safety Plan The Contractor shall submit a written safety plan immediately following contract award. At a minimum, this plan shall describe the Contractor's general safety program and identify specific safety provisions for hazards incidental to the contract work such as elevated working surfaces, working over water, working from floating work platforms, overhead crane operations or similar conditions of the work. This Safety Plan shall be approved prior to commencing any work on site. Performance Period: Performance of work is expected to commence NLT 10 days after award is made. Extension period must be approved by the Contracting Officer for any unforeseen delays. **All Questions and Answers will not be accepted after 14 Feb 2024 at 10:00AM EST. APPLICABLE FAR CLAUSES FAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items). ATTACHED BY REFERENCE 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS 52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984) 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984) 52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995) Work hours: Monday through Friday, 0730 - 1800 (7:30 am - 6 pm) No weekends or Holidays authorized. See attached applicable FAR Clauses by reference. Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov. Request Company's tax ID information and Duns number. Vendors providing an offer must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an "ACTIVE" status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.

Post-Bid

Military

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
10
Bidding Soon
487
All Active Projects
193
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2024

March 20, 2024

img_map_placeholder

183 Palermo Dr, Islamorada, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.