Site work for a mixed-use development in Aurora, Colorado. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

Reference Number 0000341562 The 2023 Traffic Signal Construction Services project includes and is not limited to construct/remove traffic signals listed below: New Traffic Signal Installations o 6th Ave and Catawba Way o Calhoun Dr / Southshore Pkwy and S Powhaton Rd o E-470 and Jewell Ave (West Intersection) o E-470 and Jewell Ave (East Intersection) o Infinity Middle School Pedestrian Hybrid Beacon (HAWK) o Stephen D Hogan Pkwy and S Picadilly Rd New Curb Ramp Construction o Harvest Rd and Infinity Middle School Project locations are subject to change. All work within this contract shall be completed per applicable Special Conditions and Special Provisions. The contractor will also furnish to the City maintenance equipment as requested by the City Traffic Operations and Maintenance. Question Acceptance Deadline 02/13/2024 at 3:00 PM MT Questions are submitted online No -- Bidders may make written inquiries concerning this ITB to obtain clarification of requirements. Written inquiries shall be emailed to: Kristin Chewiwi, Procurement Supervisor, at kchewiwi@auroragov.org AND Chris Stephan, Project Manager, at cstephan@auroragov.org. General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % -- Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond, payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. Original bid bond does not have to be delivered to the City; however, each bidder should maintain the original on file should the City request it at a later time. Liquidated Damages which are $1,000.00 per day. The Contract Documents require that all work be completed within twelve (12) months The estimated cost for this this project ranges from $4,893,000.00 to $5,139,000.00. *The City of Aurora reserves the right to reject any and all Bids, to waive informalities and irregularities, and to accept that bid which is considered to be in the best interest of the City *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$3,909,227.00

Public - City

Site Work

27

9

4

7

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
39
Bidding Soon
982
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

June 10, 2024

img_map_placeholder

Multiple Locations, Aurora, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.