BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Jonesboro, Arkansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Purpose of This Project is to Level and Overlay Approximately 14.297 Miles of Highway 49 in Craighead and Poinsett Counties. This Project Consists of Removal and Disposal Items, Earthwork, Aggregate Base Course, Achm Surface Course, Cold Milling Asphalt Pavement, Achm Patching of Existing Roadway, Approach Gutters, Maintenance of Traffic, Guardrail, Erosion Control, Rumble Strips and Stripes, Pavement Marking, and Misc. Items. Routes: 49 Sections: 4 & 5 County: Craighead & Poinsett Length: 14.297 Miles in Length. Questions pertaining to projects during the advertisement period should be addressed to the Program Management Division at pmd@ardot.gov. The deadline to submit a question is the Wednesday prior to the scheduled letting date. A question submitted after the close of business on the Wednesday prior to the scheduled letting date may not receive a response. In Order to Have a Bid Considered, Contractors Must Furnish a Proposal Guaranty Consisting of Either a Bidder's Bond or a Certified or Cashier's Check in the Amount of Five Percent (5%) of the Total Amount Bid. in Order for a Bond to Be Acceptable to the Department, the Company Issuing the Bond Must Be Named in the Department of Treasury Listing of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies. the Underwriting Limitation of the Bonding Company Shall Be Adhered to. Any Excess (Between the Face Amount of the Bond and the Underwriting Limitation) Shall Be Protected by Reinsurance Provided by an Acceptable Reinsuring Company. These Contracts Are Subject to Normal Prequalification, Licensing and Bonding Requirements, Applicable Labor Laws, Non-discrimination Provisions, Wage Rate Laws and Other Federal Laws Including the Fair Labor Standards Acts of 1938. the Work Hours Act of 1962 and Title Vi of the Civil Rights Act of 1964 Also Apply. The Arkansas Department of Transportation (ARDOT) complies with all civil rights provisions of federal statutes and related authorities that prohibit discrimination in programs and activities receiving federal financial assistance. Therefore, ARDOT does not discriminate on the basis of race, sex, color, age, national origin, religion (not applicable as a protected group under the Federal Motor Carrier Safety Administration Title VI Program), disability, Limited English Proficiency (LEP), or low-income status in the admission, access to and treatment in ARDOTs programs and activities, as well as ARDOTs hiring or employment practices. Complaints of alleged discrimination and inquiries regarding ARDOTs nondiscrimination policies may be directed to Civil Rights Officer Joanna P. McFadden (ADA/504/Title VI Coordinator), P. 0. Box 2261, Little Rock, Arkansas 72203-2261, (501) 569-2298, (Voice/TTY 711), or the following email address: joanna.mcfadden@ardot.gov. This Proposal Contains the Job Special Provision site Use (a+c Method)-calendar Day Contract for Bidding in Which the Bidder Will Determine the Number of Calendar Days to Complete the Project. The Department Reserves the Right to Reject Any or All Bids and to Waive Any Formalities. ARDOT - Hwy. 226 - Hwy. 14 (Sel. Secs.) (S)

Award

Roads / Highways

$5,026,372.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
19
Bidding Soon
375
All Active Projects
134
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2024

March 29, 2024

img_map_placeholder

US 49, Jonesboro, AR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.