BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Wilson, North Carolina. Completed plans call for site work for a water / sewer project.

Question Deadline 02/14/2024 at 12:00 PM ET The Project includes the following Work: The Wilson Ballpark Utilities Expansion Project is for the replacement, relocation, and size increase of utilities to support future economic development initiatives located in downtown Wilson. To aid in development, the City of Wilson must upsize existing infrastructure and relocate to make way for potential development. Development in the area includes commercial and high density residential (multi-story apartments and hotels). This project spans multiple blocks along the roadways (city and state maintained) and some work within City owned parcels of land. The specific project components include, but are not limited to, replacing 6" various materials of sewer to 12" DIP and PVC, 6" various materials of water to 12" DIP and PVC, and upsizing from 30" RCP to 42" RCP stormwater pipes. There is approximately 2,300 LF of stormwater RCP to be installed, 1,850 LF of DIP sewer to be installed, 2,000 LF of DIP water to be installed, multiple boxes for stormwater, manholes for stormwater and sewer, and valves for water installation. The Project has an expected duration of 120 days. Question Deadline 02/15/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Submit all questions for Bidding to Brandon Rountree, PE (brountree@wilsonnc.org). Questions received less than seven days prior to the date for opening of Bids may not be answered. Submit all questions for Bidding to Brandon Rountree, PE (brountree@wilsonnc.org). A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. State of NC MBE/WBE participation goal: 10% (combined) EPA MBE/WBE participation goals: MBE 10.9% WBE 10.4% Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement. 4.02 Bidder accepts the provisions of the Agreement as to liquidated damages.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

27

14

62

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
63
Bidding Soon
1,028
All Active Projects
386
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

img_map_placeholder

409 Goldsboro St S, Wilson, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.