BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Marina, California. Contact the soliciting agency for additional information.

Monterey-Salinas Transit (MST) solicitations are either Requests for Proposals (RFP), or Invitations for Bids (IFB). MST sends RFPs to obtain proposals when a contract is competitively negotiated, with price and other factors evaluated to determine the proposal offering the best value to MST. RFPs are typically for professional services. An IFB is used to obtain bids when a contract is competitively bid. The contract is awarded to the responsible and responsive bidder submitting the lowest bid. IFBs are usually for services such as construction, goods, supplies and equipment, and general services. MST has established a Disadvantaged Business Enterprise in accordance with regulations of the U.S. Department of Transportation (DOT). For DBE and small business information Question Submission Deadline: Wednesday, February 14 by 12:00 P.M. SCOPE OF WORK Project Overview: The objective of this project is to enhance the visual appeal and functionality of the designated landscape area. The scope of work includes various tasks to improve the overall aesthetics, sustainability, and usability of the space. Tasks: 1. Site Assessment: o Evaluate the current condition of the landscape area. o Identify existing plantings, hardscape features, and any issues that need attention. o Document any specific client preferences or requirements. 2. Site Preparation: o Clear the area of debris, weeds, and unwanted vegetation. o Remove any dead or diseased plants. o Prepare the soil for planting, including amending the soil as necessary. o Install new plants, shrubs, trees, and flowers as per the approved design. o Ensure proper spacing and depth for planting. o Use appropriate soil amendments and mulch for plant health and aesthetics. o that outlines regular care for the newly landscaped area. 3. Cleanup: o Remove all construction debris and waste materials from the site. o Ensure the landscape area is left clean and presentable. 4. Final Inspection: o Conduct a final walkthrough to ensure that all elements meet the project's requirements and design specifications. o Address any outstanding issues or client concerns. Project Completion: Upon completion of the landscape beautification project, the area should exhibit improved aesthetics and functionality, aligning with the approved design and client expectations.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
41
Bidding Soon
848
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

April 1, 2024

img_map_placeholder

280 Reservation Rd, Marina, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.