BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 25, 2024 at 8:00 PM

Updated July 26, 2024

Site work and paving for a civil project in Bourne, Massachusetts. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This Program will include the replacement of the Bourne and Sagamore bridges, provide new connections to the local roadway network and improve multimodal accommodations within the Cape Cod Canal area. As of July 24, 2024, this project is in the early planning phase. A combined Final EIS/record of decision (ROD) Document is expected to be issued towards the end of February 2026. An engineer has not been selected. A firm timeline for construction has not been been determined.

Conceptual

Bridges / Tunnels

$371,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
169
Bidding Soon
3,264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2027

Project location map

To Be Determined, Bourne, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.