BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a golf course in Rockton, Illinois. Working plans call for site work for a golf course.

As of May 21, 2024, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. No pre-bid meeting will be held. Project Questions should be directed to Vaughn Stamm, Director of Operations, Forest Preserves of Winnebago County, 815-516-2652 It is the intention of these specifications to describe the general requirements updating the exterior of the clubhouse at the Macktown Golf Course Clubhouse, 2221 Freeport Road, Rockton, IL 61072. All parts not specifically mentioned in the scope of these specifications which are necessary to provide complete installation shall be furnished by the successful bidder. These specifications shall be construed as minimum. GENERAL SCOPE OF WORK This project will include installation of vinyl siding, aluminum fascia, vinyl soffit, aluminum gutters & down spouts, window and door wraps. Removal of all lap siding is required. Eight (8), small, existing windows to be removed and covered. All remaining windows will need to have flat exterior casing installed and wrapped. All siding, facia, trim, soffit, gutters and down spouts to be color matched in Tan. All old or excess materials will need to be disposed of by contractor. The work described in these specifications represent the minimum requirements for construction and installation for the exterior of the clubhouse: o Remove lap siding on portions of the building o Install flat exterior wood casing around windows and doors where needed and wrap in aluminum o Install tan color aluminum drip caps and trim around all windows and doors o Remove and sheet over eight (8) existing small windows and add rolled insulation (r-13 rating minimum) behind board covering old window openings o Install wind and moisture Tyvek wrap on building o Remove existing wood, install and wrap new 1"x12" and 1"x10" fascia (tan aluminum) o Install Tan vinyl soffit, staggered with vented and unvented sections o Install D4 (.044") minimum, wood grain vinyl siding (Tan Color) with Tan Color inner & outer corners o Remove old gutters and install new 6" .032 gauge K-style seamless aluminum gutters (tan color) o Remove old gutters & downspouts and install new 3"x4" aluminum gutters & downspouts (Tan color) OPTION #1 o Remove and replace windows with new double paned, vinyl clad units in four (4) locations and install interior case or face trim boards as needed to provide finished look OPTION #2 o Install T-Rex Gutter Guards or equivalent to all new gutters

Final Planning

Golf Course

$73,794.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
105
Bidding Soon
1,918
All Active Projects
818
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

November 21, 2024

img_map_placeholder

2221 Freeport Rd, Rockton, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.