Site work and paving for a mixed-use development in Whitehall, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Removal of the existing parking lot surface, utilities, and other removal sheet items. Install new storm, electrical, and conduit for irrigation. Site improvements includes curb & gutter, integral colored concrete, standard concrete, HMA paving, masonry seat wall, restroom building, lighting, and site furnishings. Restoration of site includes new landscaping and seed with imported topsoil. Doc Notes: Electronic drawings, specifications and bidding documents will be accessible/available only to those Bidders who are active members of the Prein&Newhof Plan Room. Bidder assumes sole risk for any project specifications and drawings, electronic or hard copy, obtained other than directly from Prein&Newhof. Hard copy drawings and specifications are available for the fee of $190.00 dollars. Prein&Newhof Plan Room members who want to purchase the hard copy of the drawings only, may do so for $103.50.00 dollars. A $20 dollar charge will be added to all mailed drawings and/or specifications. Fees are payable by cash or check only and are not refunded. FUNDING : The work to be performed under this contract will be financed and paid for by local funds. Bond Notes: A bid bond, certified check, or cashier's check payable to The City of Whitehall in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of forty-five (45) days after the receipt of bids. Owner Rights: The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least sixty (60) days thereafter. Award of the project is anticipated on March 12, 2024 with Notice to Proceed anticipated in March 19, 2024. COMPLETION DATE : The projects shall be substantially completed by November 1, 2024 and ready for final payment on November 8, 2024. Questions related to the project shall be directed to Dan Sorek, P.E. at 616.218.2940 or via email at dsorek@preinnewhof.com.

Bid Results

Sidewalks / Parking Lot

$6,000.00

Public - City

Paving, Site Work

25

11

34

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Aggregate Surfacing, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Slings
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
61
Bidding Soon
684
All Active Projects
303
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

March 19, 2024

img_map_placeholder

Multiple Locations, Whitehall, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.