Published March 27, 2024 at 8:00 PM

Updated March 29, 2024

Site work for a water / sewer project in Dalton, Georgia. Completed plans call for site work for a water / sewer project.

Miracle Field Sewer Extension. The Contractor's work also includes all erosion, sedimentation, and pollution control necessary for the project. The cost of any permits required for erosion control and land disturbing will be borne by the Owner. The Contractor will be responsible for the cost of any other permits or licenses required to complete the work. Pre-qualification of bidders for this project is required. Bidders must submit a pre-qualification package containing requested information to the office of Dalton Utilities by 5:00 P.M., local time, Thursday, February 22, 2024. All applicants submitting prequalification documentation will be notified of their status via phone call to the contact person listed on the package by 5:00 P.M. Friday, February 23, 2024. Only bids submitted by properly pre-qualified bidders will be opened. Work to be Done: The work to be done (hereinafter referred to as Work consists of furnishing all materials and equipment, except those specified in the Bid, and performing all labor necessary for the following project (hereinafter referred to as Project. The Owner is authorized to issue change orders, without the necessity of additional requests for bids, within the scope of the Project when appropriate or necessary in the performance of the contract. No additional work shall be performed unless authorized by the Owner. All work as specified herein shall be completed within 240 calendar days of notice to proceed. Contractors submitting bids on project must be prepared to proceed with work within three weeks of bid opening. A bid bond will be required in the amount of 10% of the total bid amount. A contract performance bond and a payment bond, in an amount equal to one hundred percent (100%) of the contract price, will be required of the successful bidder. The right is reserved to accept or reject any and all bids and to waive technicalities and informalities.

Post-Bid

Water / Sewer

$560,000.00

Public - City

Site Work

7

12

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
108
Bidding Soon
1,746
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

April 5, 2024

Project location map

Multiple Locations, Dalton, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.