EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 8, 2024 at 8:00 PM

Updated August 9, 2024

Site work for a water / sewer project in Irving, Texas. Completed plans call for site work for a water / sewer project.

Gas line relocation is still pending. This project will be re-issued once this is taken care of. The work to be performed under this contract consists of furnishing all materials, appurtenances, tools, equipment, labor and incidentals necessary to install complete in place the major work noted below in addition to other bid items identified in this contract. A. One Thousand five hundred (+-1,500) LF of 24" Fusible PVC wastewater main B. T wo hundred and forty-four (+-200) LF of 24" Fusible PVC wastewater main by Pilot Tube Guided Auger Bore C. Seven 5-foot diameter polymer concrete manholes with 60 feet of vertical extra depth D. Two hundred (+-200) LF of 18" Wastewater Cure -in-Place Pipe The above listed work together with all associated appurtenances and other incidental items to complete this project will be installed in the following locations in the City of Irving: A. By SH114 Frontage road and easement crossing Teleport Boulevard Please call the individual listed on the solicitation if you require assistance with this submittal. In the case of an RFP or RFQ, any hard copy requirements in addition to the electronic response will be noted in the specifications. Your cooperation is greatly appreciated. Question Deadline 06/26/2024 at 3:00 PM CT No verbal questions will be accepted. Submit questions electronically via this site. No verbal questions will be accepted. . If you have questions or concerns about the bidding process in general, please contact: Leona Franklin, Sr. Purchasing Agent lfranklin@cityofirving.org 972.721.3743 bid open info Dial by your location o +1 346 248 7799 US (Houston) o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 669 444 9171 US o +1 669 900 6833 US (San Jose) o +1 719 359 4580 US o +1 689 278 1000 US o +1 929 205 6099 US (New York) o +1 301 715 8592 US (Washington DC) o +1 305 224 1968 US o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US o +1 564 217 2000 US o +1 646 931 3860 US o 877 853 5257 US Toll-free o 888 475 4499 US Toll-free Meeting ID: 950 7078 1060 1 st pre bid info Dial by your location o +1 346 248 7799 US (Houston) o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 669 444 9171 US o +1 669 900 6833 US (San Jose) o +1 719 359 4580 US o +1 301 715 8592 US (Washington DC) o +1 305 224 1968 US o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US o +1 564 217 2000 US o +1 646 931 3860 US o +1 689 278 1000 US o +1 929 205 6099 US (New York) o 888 475 4499 US Toll-free o 877 853 5257 US Toll-free Meeting ID: 925 4596 3895 Find your local number: https://zoom.us/u/abQILCdfmh 2nd pre bid info Dial by your location o +1 346 248 7799 US (Houston) o +1 719 359 4580 US o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 669 444 9171 US o +1 669 900 6833 US (San Jose) o +1 386 347 5053 US o +1 507 473 4847 US o +1 564 217 2000 US o +1 646 931 3860 US o +1 689 278 1000 US o +1 929 205 6099 US (New York) o +1 301 715 8592 US (Washington DC) o +1 305 224 1968 US o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o +1 360 209 5623 US o 877 853 5257 US Toll-free o 888 475 4499 US Toll-free Meeting ID: 960 3935 2426 Find your local number: https://zoom.us/u/aRfymYFSN

Bid Results

Water / Sewer

$5,779,363.00

Public - City

Site Work

35

17

4

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Gabions, Gabion Mattresses, Shoring and Underpinning, Shoring, Sheet Piling, Concrete Raising, Pressure Grouting, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Plugging, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
63
Bidding Soon
3,560
All Active Projects
1,327
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.