BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Carey, Idaho. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Site Directions: 23786 From Carey: Turn west onto Little Wood Reservoir Road, proceed for approximately 3.7 miles, merge with Little Wood River Reservoir Road (still called Little Wood Reservoir Road), continue for approximately 12.2 miles until reach destination at Muldoon Creek. 43.503849042059116, -114.00343642368458 23791 Turn west onto Little Wood Reservoir Road, proceed for approximately 3.7 miles, merge with Little Wood River Reservoir Road (still called Little Wood Reservoir Road), continue for approximately 10.4 miles until reach High Five Road Intersection, turn west and procced on High Five Road for approximately 2.4 miles, turn right (East) onto Muldoon Canyon Road, proceed for approximately 0.2 miles until reach destination at Little Wood River. 43.50451052428758, -114.0570764811485 23791 remove and replace a local bridge in Blaine County on Muldoon Canyon Road Over Little Wood River. The existing bridge is a single span timber bridge with concrete abutments. The new bridge is a single span concrete voided slab bridge with GRS-IBS abutments. Additional work includes reconstruction of the roadway approaches, coordination of utility abandoning, and other miscellaneous work, in accordance with the applicable 2023 Idaho Standard Specifications for Highway Construction (SSHC), 23786 remove and replace a local bridge in Blaine County on Little Wood Reservoir Road Over Muldoon Creek. The existing bridge is a single span steel bridge with concrete abutments. The new bridge is a single span concrete voided slab bridge with GRS-IBS abutments. Additional work includes reconstruction of the roadway approaches and other miscellaneous work, in accordance with the applicable 2023 Idaho Standard Specifications for Highway Construction (SSHC) Est. Value Notes: $1 million - $3 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All bridges must be completed by the Final Completion Date of June 30, 2025.

Award

Bridges / Tunnels

$3,096,862.00

Public - County

Paving, Site Work

85

4

2

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
4
Bidding Soon
55
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

April 22, 2024

img_map_placeholder

Multiple Locations, Carey, ID

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.