Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 6, 2024 at 7:00 PM
Updated March 7, 2024
Site work for a water / sewer project in Wilmette, Illinois. Completed plans call for site work for a water / sewer project.
In 2023, the Village issued an RFP for the review of its current operation and maintenance practices and development of a capital infrastructure plan with a condition assessment for the Village's water transmission mains (WTMs). The work is scheduled to be completed by the end of 2023 and performed by a consulting engineering firm with qualified experienced professionals specializing in pre-stressed concrete pressure pipe (PCCP). Final deliverables of the project include the following: • Capital Infrastructure Plan which includes short-term (1-5 years) and long-term (6-20+ years) recommendations for the inspection, maintenance, repair, and replacement of the WTMs, including descriptions, timelines, and estimated costs for each recommendation. • Evaluation of the efficacy of various methods and technologies for assessing the structural integrity of the PCCP WTMs. • Condition assessment with an estimated remaining service life for the WTMs, as well as estimated cost and timeframe for replacement; and, • Provide a standard data structure for use in reporting the results of the Village's condition assessment work to the Village Board and public. This project is included in the city’s 2024-2033 Capital Improvement Program (CIP). As of March 6, 2024, per owner, consulting services are tentatively scheduled for Spring 2024; no construction associated with this project. Consultant not identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Award
Water / Sewer
$160,750.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2024
To Be Determined, Wilmette, IL
Related To This Project
Wilmette, IL
Bid Date: Mar 28 2024
Wilmette, IL
Bid Date: Apr 10 2024
Wilmette, IL
Bid Date: Apr 11 2024
Wilmette, IL
Bid Date: May 14 2024
Wilmette, IL
--
Wilmette, IL
Bid Date: May 30 2024
Wilmette, IL
Bid Date: May 21 2024
Wilmette, IL
Bid Date: Jun 27 2024
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
