Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Wilmette, Illinois. Conceptual plans call for site work for a water / sewer project.
The Village has approximately 9,000 water meters installed throughout the distribution system that are read on a quarterly basis. Meters are replaced based on age and usage, with an average life of 13-20 years. As water meters age, they tend to slow down and under-register water use. Between 2007 and 2014, the water meter replacement program suffered a reduction in replacement due to the acceleration of the automatic meter reader (AMR) installations and staff attrition. This led to a backlog of meters in need of replacement. By the beginning of 2016, the percent of meters that were older than 15 years had increased to almost a third of all meters in Wilmette or almost 3,000 meters. In 2016, the Village Board approved a funding increase in the meter replacement program in order to clear the backlog and maintain a 15-year replacement rate. As a result, only 18% of all meters (or 1,607) are over 15 years old. As of February 22, 2024, this project is included in the city’s 2024-2033 Capital Improvement Program (CIP). Construction funded for FY2024-2033. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$575,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2024
To Be Determined, Wilmette, IL
Related To This Project
Wilmette, IL
Bid Date: Mar 28 2024
Wilmette, IL
Bid Date: Apr 10 2024
Wilmette, IL
Bid Date: Apr 11 2024
Wilmette, IL
Bid Date: May 14 2024
Wilmette, IL
--
Wilmette, IL
Bid Date: May 30 2024
Wilmette, IL
Bid Date: May 21 2024
Wilmette, IL
Bid Date: Jun 27 2024
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Wilmette, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.