BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Tabernacle, New Jersey. Completed plans call for the renovation of a educational facility.

a. Seneca High School - Boiler Plant Upgrades 1. Removal of the existing boiler plant at Seneca High School, including existing boilers, boiler venting systems, pumps, expansion tanks and associated pumps, piping and accessories as depicted on the contract mechanical, plumbing and electrical drawings and as required to accommodate the proposed scope of the work. 2. Installation of new mechanical systems, including installation of four new natural gas condensing boilers, boiler venting systems, exhaust fans, pumps, expansion tanks, air separators, piping and accessories as scheduled and detailed. 3. Plumbing work specified and necessary to complete the scope of the work, including but not limited to gas service to the new boilers and alteration to the drainage systems. 4. Electrical work specified and necessary to complete the scope of the work. 5. BMS installation and integration as delineated within the contract mechanical drawings and specifications. 6. Restoration of existing building finished affected or altered und the scope of this contract, including but not limited to interior wall, ceiling and floor finishes, interior masonry finishes and the existing roof. The existing roof at Seneca High School is under warranty. The contractor shall perform any and all repairs in accordance with the details and specifications and warranty standards specified within these documents. 1. Phase II and III HVAC Renovations. Supply and installation of new HVAC systems primarily, including AHU’s, RTU’s, exhaust air systems, piping and pump systems upgrades, as well as associated structural, plumbing, and electrical improvements throughout the building under multiple contracts. The contractor for this contract is expected to cooperate with these separate contractors at all times throughout the duration of the construction project. 2. BMS Integration. BMS integration shall be performed by the Owner’s integration Contractor (AME Inc.). The Contractor(s) and all sub-contractors shall coordinate their work with this separate BMS integration contractor. It is anticipated that this work shall be performed upon completion of the work of this contract. 3. Lighting Fixtures. The supply and installation of certain lighting fixtures within the affected rooms shall be performed by a separate contractor. The Contractor(s) and all sub-contractors shall coordinate their work with this separate lighting contractor. It is anticipated that this work shall be performed concurrent with the work of this contract. Lenape Regional High School District Board of Education Lenape Regional High School District BOARD OF EDUCATION hereby requests sealed bids for Project No. 8271/Bid No. 105-24: Lenape Regional High School District - Seneca High School Boiler Replacement. The Bidder shall further name and include all required pre-qualification information for the following Subcontractors C009 General Construction/Alterations & Additions C030 Plumbing* C047 Electrical* *Copy of licenses must be included with bid The Bidder, and any sub-contractor classified under the above categories must present evidence INCLUDED WITHIN THEIR FORM OF BID, of their pre-qualifications, including current New Jersey Schools Development Authority (NJSDA), Division of Property Management and Construction (DPMC) Copy of "Notice of Classification", Current DPMC Copy of "Total Amount of Uncompleted Contracts" and Business Registration Certificate. Bidding shall be in conformance with the applicable requirements of NJSA 18A:18A-1 et. seq., the Public School Contracts Law. All questions pertaining to securing Contract Documents, Bidder's Lists, etc. shall be directed to: The Design Collaborative, Architects & Planners, PA 1940 Route 9 North Cape May Court House, NJ 08210-1110 Phone (609) 465-4111 office@tdc-tvc.com All questions pertaining to the contract documents, technical sections, legal documents, and bid submission shall be directed in writing, no later than Tuesday, February 27, 2024 at 5:00 pm to The Design Collaborative, Architects & Planners, PA: fax: (609) 465-9358; email: Office@tdc-tvc.com. IF NECESSARY, AN ADDENDUM WILL BE ISSUED on or before Thursday, February 29, 2024. The Lenape Regional High School District Board of Education assumes no responsibility whatsoever in connection with any defects arising out of the issuance of the Contract Documents or the receipt or failure to receive bids, including those which may arise from delay for any reason in obtaining the Contract Documents or submitting the Contract Bid Forms, including but not limited to traffic delay, messengering, mislabeling, misdirections from any source, misdelivery or otherwise. When it is its best interest to do so and to the maximum extent of its discretion under applicable law, the Lenape Regional High School District Board of Education may award the Contract in whole or in part, select any combination of bids and alternates, may waive informalities, and may reject any or all bids

Award

Educational

$1,017,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
329
Active Projects
135
Bidding Soon
3,403
All Active Projects
1,498
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

April 12, 2024

img_map_placeholder

110 Carranza Rd, Tabernacle, NJ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.