BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for an educational facility in Oklahoma City, Oklahoma. Completed plans call for site work for a educational facility; and for outdoor lighting for a educational facility.

As of May 6, 2023, project was awarded to Negawatt Partners, LLC, awarded amount is $548,907.32 Oklahoma City Community College Campus Led Lighting Conversion Project phase Ii Announcements on the Day of Bid Opening Supersede All Other Announcements, Oral or Written. Purchase and install qualified luminaries as per the performance criteria outlined in enclosed exhibits and in the quantities and locations identified in the exhibits. No material substitutions. 2. Provide all necessary equipment, hardware, adapters, and any other materials necessary for a complete quality installation. Endure installation quality, compliance with project schedule and proper disposal and/or recycle of old luminaries. 3. Contractor shall warrant all labor and replace defective LED luminaries and parts thereof for a period of one (1) year from the date of project completion. The warranty for the luminaries shall be no less than ten (10) years. 4. Manage deliveries and staging of material to site including any secured storage considerations. 5. Prepare and manage appropriate waste disposal facility and facilitate proper disposal of waste material including old luminaries. All excess property for this job shall be coordinated with the College for either disposal or salvage. 6. The College shall meet, at a minimum, bi-weekly with the Contractor to review installation, work safety, public safety, waste material handling procedures and requirements, and coordination with other contractors and projects. 7. Inspect final work and correct any "punch list" items. 8. The Contractorshall test and commission all LED lights outlined in the plansto ensure that they work as per the performance specifications. 9. The Contractor will be responsible for the cleaning of all light lenses where applicable. 10. Contractorshall replace all power drops from existing junction to said interior fixture. 11. Contractor shall install new suspension chain on suspended fixtures. 12. Contractor shall replace any materials damaged during installation and provide any materials necessary for proper installation. 13. Where an emergency lighting fixture exists, the inclusion of an LED battery backup system is required. 14. As part of the SFB response, the Contractor shall provide an itemized and detailed breakdown of the contract price. 15. The Contractorshall complete its own survey and validation of the quantities outlined in this SFB and shall report discrepanciesto the College. Thisincludes differences with LED battery ballast sizes and quantities The Contractor shall have access to the facility for work to be performed per the following hours of access: Page | 10 o Contractor shall have access for project performance Monday-Friday 6:00 AM to 5:00 PM or as defined through seasonal operating hours schedules. o Work may be performed on Saturdays with a 48-hour prior request and approval if determined necessary by the College

Award

Educational

$548,907.00

Public - City

Outdoor Lighting, Site Work

3

5

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
49
Bidding Soon
441
All Active Projects
200
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

April 11, 2024

img_map_placeholder

7777 S May Ave, Oklahoma City, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.