BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2024 at 8:00 PM

Updated March 19, 2024

Site work and paving for a sidewalk / parking lot in Tupelo, Mississippi. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Plans call to construct an extension of the Chisha Foka Multi-Use Trail. The proposed extension is 2.5 miles. As of March 18, 2024, the public comment period was closed on February 29, 2024. Information regarding a design team is not available. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Sidewalks / Parking Lot

$120,000.00

Public - Federal

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
43
Bidding Soon
582
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

Project location map

Natchez Trace Pkwy, Tupelo, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.