BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2024 at 8:00 PM

Updated March 30, 2024

Site work for a water / sewer project in Georgetown, South Carolina. Completed plans call for site work for a water / sewer project.

Document Notes : upon payment of a non-refundable charge of $150 for any individual Contract, or $250 for two Contracts, or $350 for three Contracts. Checks for Bidding Documents shall be payable to Hanna Engineering." Upon request and receipt of the document charge indicated above, the Issuing Office will transmit the Bidding Documents via delivery service. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bid security shall be furnished in accordance with the Instructions to Bidders. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriation Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The Project consists of three separate contracts as listed below. Contract 1 - Northern Water System - will consist of installing approximately 13,500 linear feet of 8" water lines, 3,600 linear feet of 6" water lines, 17 fire hydrants, and all associated appurtenances. Contract 2 - Southern Water System - will consist of installing approximately 900 linear feet of 10" HDPE water lines, 18,700 linear feet of 8" water lines, 3,000 linear feet of 6" water lines, 18 fire hydrants, and all associated appurtenances. Contract 3 - Automatic Meter Reading System - will consist of replacing 1,341 - 3/4 ", 3 - 1", and 4 - 2" water meters. It will also include providing an automatic meter reading system to read all newly replaced water meters. Bids will be received for three separate contracts. Bidders submitting on multiple contracts shall submit each bid in separate sealed envelopes. Bids shall be on a unit price basis with additive alternate bid items as indicated in the Bid Form.

Post-Bid

Water / Sewer

$3,000,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
60
Bidding Soon
623
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

June 24, 2024

Project location map

Multiple Locations, Georgetown, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.