BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Tulare, California. Completed plans call for the renovation of a educational facility.

Paint interior of ali classrooms which include doors, door jambs, & window sills of each classroom. Owner will supply Primer and Urethane Acrylic Sealant. Primer will be delivered once the Owner has inspected prep work. One thick coat of Primer is to be applied. Contractor must clean and prep the interior of rooms to be primed and painted as per manufacturers specifications. Any peeling paint will need to be cut, sanded, and sealed for painting. All holes are to filled prior to painting. Contractor is to cover all areas where painting will be applied including all School equipment (whiteboards, speakers, Tv's, pull stations, horns, thermostats, carpet & wall coving etc.). Any paint spilled on school equipment or carpet will be billed to the Contractor. Paint and primer all rooms using rollers & brushes. Use of airless is prohibited in the rooms. All seams & gaps are to be sealed and filled in prior to priming with Urethane Acrylic Sealant. Prep and sand all windows sills prior to priming using 180/220 gritsandpaper. All staples must be removed prior to priming. Paint will be delivered once the owner has inspected the primer coat. There are to be 2 top coats applied after primer. Owner will inspect work in between coats applied. Contractor must maintain the premise and area of work in a neat condition. All rollers & brushes are to be disposed of by the Contractor. There is not to be any rollers or brushes left inside of paint buckets. Contractor is responsible for removing any window coverings before primer or painting. Contractor is responsible of installing window coverings after painting is done. Empty tubes of Acrylic Sealant are to be placed back in the box upside down. Empty Primer & Paint buckets are to be stacked and kept on site. No Smoking or Smoking in vehicles are permitted on any school property. Contractors are not allowed to argue with staff during the Paint Project. If Contractors has questions or concerns, Contractor is contact Jaime Mendez at 559-373-1248.

Post-Bid

Educational

$50,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
26
Bidding Soon
387
All Active Projects
164
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

June 17, 2024

img_map_placeholder

Multiple Locations, Tulare, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.