Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Lake Elsinore, California. Contact the soliciting agency for additional information.
Elsinore Valley Municipal Water District (EVMWD) is a publicly-owned water and sewer service agency with approximately 46,000 water services and 36,600 sewer service connections, serving a population of approximately 157,000. EVMWD operates a diverse potable water distribution system that involves groundwater wells, in addition to surface and imported water supplies. In total, the District operates 13 groundwater wells with the pumping capacity of approximately 17,900 acre-feet per year. Water produced from some of the groundwater wells may exceed the notification, response, or Maximum Contaminant Levels (MCLs) for certain constituents and must be treated and/or blended with water from other sources to meet drinking water standards. The Back Basin Groundwater Treatment Plant (BBGWTP) and Corydon Blend are two facilities that the District utilizes to treat water that exceed MCLs and or established notification/response levels for arsenic, vanadium, and PFAS in compliance with regulatory requirements. The BBGWTP treats water produced from Cereal 3 Well and Cereal 4 Well. The treated water from BBGWTP is currently routed directly into the distribution system. The Corydon Blend was sized to handle water from four (4) wells (Summerly, Diamond, Cereal 1, and Corydon Wells) with the intent of blending higher quality water to comply with regulatory requirements before entering the distribution system. Due to continuing changes in water quality regulations, the District needs to increase the volume of water that can be delivered through the Corydon Blend. Under the current system operations, Cereal 1 and Corydon Wells are dependent on the operation of Summerly and Diamond Wells. If Summerly and Diamond Wells are offline, Cereal 1 and Corydon Wells are stranded assets and cannot be operated. To resolve this problem, the Upsize Blending Line at Diamond Project (Project) proposes to upsize 3,030 LF of 12-inch PVC blending pipeline with 20-inch DIP and CML&C pipeline and associated appurtenances located between Summerly Well and Diamond Well along Diamond Drive. Once the line is upsized, staff can divert BBGWTP water through the Corydon Blend to improve operational flexibility and reliability. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% EVMWD intends to initiate this project on June 2024, anticipating completion on March 31, 2025. Consultant will remain on contract through the one year warranty period.
Post-Bid
Water / Sewer
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2024
July 5, 2024
Multiple Locations, Lake Elsinore, CA
Related To This Project
Lake Elsinore, CA
Bid Date: Mar 14 2024
Lake Elsinore, CA
Bid Date: Mar 11 2024
Lake Elsinore, CA
Bid Date: Mar 11 2024
Lake Elsinore, CA
Bid Date: Mar 20 2024
Lake Elsinore, CA
Bid Date: May 09 2024
Lake Elsinore, CA
--
Lake Elsinore, CA
Bid Date: Apr 08 2024
Lake Elsinore, CA
--
Lake Elsinore, CA
Bid Date: Apr 09 2024
Lake Elsinore, CA
Bid Date: Feb 15 2024
Lake Elsinore, CA
Bid Date: Feb 29 2024
Lake Elsinore, CA
Bid Date: Mar 13 2024
Lake Elsinore, CA
Bid Date: Jan 27 2024
Lake Elsinore, CA
--
Lake Elsinore, CA
Bid Date: Dec 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.