Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2025 at 8:00 PM
Updated March 12, 2025
Site work and new construction of a mixed-use development in Clemson, South Carolina. Completed plans call for the construction of a 245,000-square-foot educational facility; and for site work for a educational facility.
Clemson University Phase 1 budget: $10,000,000 for design work for the Education & General (E&G) portion of the College of Veterinary Medicine Project. Clemson University Phase 2 budget: $95,000,000 to complete design work for the E&G portion of the College of Veterinary Medicine Project, begin initial site work and to award early release packages for long lead time items such as HVAC equipment, electrical transformers and switchgear, and structural systems for the E&G facility project. Clemson University has broken ground on the Harvey S. Peeler Jr. College of Veterinary Medicine. This new college, the first and only of its kind in South Carolina, will address the state’s critical need for veterinarians while advancing Clemson’s land-grant mission of education, research, and service. The first class is expected to arrive in Fall 2026. Located across from Clemson’s Equine Center in Pendleton, SC, and adjacent to the Clemson Experimental Forest, the college will feature six state-of-the-art buildings designed to foster collaboration, hands-on learning, and professional growth. The six specialized buildings each have a unique purpose, which needed to be integrated into the overall design strategy. The six facilities include: The Hub: A vibrant center for classes, studying, and student engagement. The Clinical Teaching Building: Home to laboratories and the Peeler College Community Clinic, where the public can access veterinary care. The Research Building: Dedicated to advancing veterinary science through faculty and graduate student research. The Ambulatory Service Building: Providing clinical rotation experience for fourth-year students as mobile veterinarians serving area farms. The Equine Teaching Building: Offering a controlled environment for equine health education. The Farm Animal Teaching Building: Equipped with specialized spaces for farm animal care training. As of March 11, 2025, project is under construction and expected to be completed in Fall 2026.
Under Construction
Educational
$285,000,000.00
Public - State/Provincial
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2023
November 18, 2024
142 Jersey Ln, Clemson, SC
Related To This Project
Clemson, SC
Bid Date: Apr 03 2025
Clemson, SC
Bid Date: Apr 03 2025
Clemson, SC
Bid Date: Apr 02 2025
Clemson, SC
Bid Date: Apr 24 2025
Clemson, SC
Bid Date: Mar 07 2025
Clemson, SC
Bid Date: Mar 07 2025
Clemson, SC
Bid Date: Feb 20 2025
Clemson, SC
Bid Date: Mar 11 2025
Clemson, SC
Bid Date: Feb 14 2025
Clemson, SC
Bid Date: Feb 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
