BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 22, 2024 at 7:00 PM

Updated February 23, 2024

Renovation of a military facility in Eglin, Florida. Completed plans call for the renovation of a military facility.

The requested work occurs in Building 380 on Eglin Air Force Base. Proposal to replace known defective and missing parts from Chiller 3 VSD. Project includes Install a new power assembly, logic board, trigger board, and bus isolation board. Replace the VSD coolant tubing on the back of the drive and replenish the variable speed drive with new inhibitor fluid. Install a clean up kit on the chiller due to being shut down and open to atmosphere for a long period of time. Does not include replacing the shaft seal, re-installing the oil filter housing, vacuuming the machine or recharging with refrigerant. The drive has not been powered and parts quoted are known parts that require replacing, any additional issues are not included. In-line duct and piping devices, including, but not limited to valves, dampers, humidifiers, wells, taps, flow meters, orifices, etc., if required to be furnished. Exclusions: 1.Labor or material not specifically described above is excluded from this proposal. 2.Unless otherwise stated, any and all overtime labor is excluded from this proposal. 3.Applicable taxes or special freight charges are excluded from this proposal The Contractor shall be required to furnish all materials, equipment, labor and personnel necessary to accomplish this task order in accordance with the contract requirements. The Contractor is expected to maintain, at all times, good and accepted construction and safety standards. If you have any questions or concerns, please feel free to contact sierra.prindle.1@us.af.mil. Project. The requested work occurs in Building 380 on Eglin Air Force Base. Proposal to replace known defective and missing parts from Chiller 3 VSD. Project includes Install a new power assembly, logic board, trigger board, and bus isolation board. Replace the VSD coolant tubing on the back of the drive and replenish the variable speed drive with new inhibitor fluid. Install a clean up kit on the chiller due to being shut down and open to atmosphere for a long period of time. Does not include replacing the shaft seal, re-installing the oil filter housing, vacuuming the machine or recharging with refrigerant. The drive has not been powered and parts quoted are known parts that require replacing, any additional issues are not included. In-line duct and piping devices, including, but not limited to valves, dampers, humidifiers, wells, taps, flow meters, orifices, etc., if required to be furnished WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

Post-Bid

Military

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
35
Bidding Soon
800
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

April 18, 2024

Project location map

380 Eglin Blvd, Eglin, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.