BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Helena, Montana. Completed plans call for the renovation of a power facility.

The Department of Interior, Bureau of Land Management (BLM), Montana State Office intends to solicit quotations for construction activities to include the furnishing of materials, labor, and equipment necessary for the installation of four grid-direct photovoltaic systems within BLM's Butte Field Office, located in Lewis and Clark County, Montana in accordance with the technical drawings and specifications. The arrays shall be located on the roof of an existing structure where feasible. Ground mounted arrays will be allowed if roofs are not adequate for loads or generation capacity. The Contractor will be required to provide documentation showing the photovoltaic systems generation capacity as follows: * Devil's Elbow Campground * 5988 York Rd, Helena, MT 59602 * 25,000 kWh annually * Holter Lake Campground * 1380 Beartooth Rd, Wolf Creek, MT 59648 * 10,000 kWh annually * White Sandy Campground * 6563 Hauser Dam Rd, Helena, MT 59602 * 11,000 kWh annually * Log Gulch Campground * 2205 Beartooth Rd, Wolf Creek, MT 59648 * 11,000 kWh annually BLM will issue Solicitation Number 140L3624Q0013 via https://sam.gov/content/opportunities, at the link provided in this notice. Pursuant to Part 13 and Part 36 of the Federal Acquisition Regulations, BLM intends to issue a Request for Quotations (RFQ) on or around February 20, 2024. The estimated price range of this acquisition is between $100,000 and $250,000. BLM anticipates issuing the RFQ under the total small business set-aside program. The applicable North American Industry Classification System (NAICS) Code is 238210 and the associated Small Business Size Standard is $19.0 Million. The Government strongly urges offerors to inspect the sites to gain a better understanding of the work requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award. An organized site visit is currently planned for Tuesday, February 27, 2024, at 10:00 am local time. Section L, Clause 52.236-27 Alternate I will have the detailed information for the site visit. A single contract award will be made to the offeror that submits a quotation that has been determined to be the best value based on Simplified Acquisition Procedures within the Federal Acquisition Regulations. A firm-fixed priced purchase order is contemplated. Quotations will be due on or around March 20, 2024, at BLM's Montana State Office, 5001 Southgate, Billings, Montana. Offerors may submit electronic quotations as a response to the anticipated solicitation. Electronic quotations will be subject to the same rules as paper quotations. The Government anticipates award of this procurement on or around April 15, 2024. The successful contractor will be required to commence work within 10 calendar days after the date the Contractor receives the notice to proceed and complete the entire work ready for use within 180 calendar days. The time stated for completion shall include final cleanup of the premises. For further information about the requirement, offerors should contact Christine Mundt at cmundt@blm.gov or at (406) 896-5030. All prospective contractors must be registered in the System for Award Management (SAM) to be eligible for award. If you have not updated SAM since October of 2020, you are advised to update early to be sure you are in compliance with the expanded Section 889 prohibitions on not using certain covered technology products. The successful contractor shall electronically submit all payment requests for the anticipated contract through the U.S. Department of the Treasury's Invoice Processing Platform (IPP). If the contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the contractor must submit a waiver request in writing to the Contracting Officer with its offer. Period of Performance: 04/25/2024 to 10/22/2024 QUESTIONS DUE: March 11, 2024, at 5:00 pm, Mountain Time. Questions submitted after this date and time will not be accepted. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Solar Power Generation

$121,325.00

Public - Federal

Renovation

17

6

40

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
8
Bidding Soon
81
All Active Projects
41
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Helena, MT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.