BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Chicago, Illinois. Completed plans call for site work for a road / highway.

Deadline for Questions 09-Feb-2024 16:00:00 Email Address: Stacy.Stewart@cityofchicago.org Project Location: The project is located at: 1 S. Ashland Av. and W. Roosevelt Rd. 2 N. Canal St. and W. Washington St. 3 S. Cicero Av. and S. Archer Av. 4 N. Cicero Av.-N. Milwaukee Av. and W. Irving Park Rd. 5 N. Clinton St. and W. Madison St. 6 N. Clinton St. and W. Washington St. 7 S. Damen Av. and W. Roosevelt Rd. 8 N. Halsted St.- N. Lincoln Av. and W. Fullerton Pkwy 9 N. LaSalle St. and W. Washington St. 10 S. Michigan Av. and E. Ida B. Wells Dr. 11 S. Michigan Av. and E. Jackson Dr. 12 S. Michigan Av. and E. Roosevelt Rd. 13 N. Natchez Av. and W. Irving Park Rd. 14 S. Oakley Av.-W. Ogden Av. and W. Roosevelt Rd. 15 S. Paulina St. and W. Roosevelt Rd. 16 N. Pine Grove Av. and W. Diversey Pkwy. 17 N. Sheridan Rd. and W. Arthur Av. 18 N. Sheridan Rd.-N. Broadway and W. Devon Av. 19 S. State St. and W. Ida B. Wells Dr. 20 N. State St. and E. Washington St. 21 S. Stony Island Av. and E. 89th St. 22 S. Stony Island Av.-S. South Chicago Av. and E. 79th St. 23 N. Wabash Av. and E. Lake St. 24 S. Wabash Av. and E. Madison St. 25 S. Wabash Av. and E. Roosevelt Rd. 26 N. Wabash Av. and E. Washington St. DESCRIPTION: The work for which proposals are invited consists of furnishing all labor, materials and equipment required for the installation of Accessible Pedestrian Signals (APS) Citywide and Central Loop. The work includes, but is not limited to, traffic signal cable installation; replacement of selected controller cabinets and controller upgrades, selected signal timing modifications, installation of pedestrian signal heads; installation of APS; construction of ADA compliant sidewalk ramps; traffic control and protection; and pavement markings, as described in the detail specifications, including all appurtenant work and accessories, to the complete satisfaction of, approval and acceptance by the City. This description of work is intended to be general in nature and is neither a complete description nor a limitation on the work to be performed. Contractor shall perform all Work described in the Contract Documents or reasonably inferable as necessary to produce the results specified therein, except to the extent specifically indicated in the Contract Documents to be the responsibility of others

Post-Bid

Roads / Highways

$520,000.00

Public - City

Site Work

209

22

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
93
Bidding Soon
1,811
All Active Projects
790
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Chicago, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.