BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Austin, Texas. Completed plans call for the renovation of a water / sewer project.

This project consists of safety improvements: replacing the ladder system and platforms within the Bascule Towers, fall protection and upgrading the HVAC system to increase de-humidification. GENERAL PERMIT #GP-2023-0282.AWU The Work consists of the following improvements to the Longhorn Dam: General: a. Implementing laydown area and material storage plans, including required reseeding, erosion and sedimentation controls and tree protection, and cleanup, b. Implementing the traffic control plan, c. Laydown area fencing, and d. Demolition and removal of some hydraulic piping, controls, grating, intermediate steel grating supports, ductwork, and ladders. e. Lead abatement, removal and disposal of doors of bascule gates. Civil improvements: f. Installing two piezometers and capping the 8" collector drainpipe with a 6" Jetfilter, g. Installing Tell-Tale crack monitors for wingwall movement h. Remove vegetation from rock riprap and grout for riprap repair. Structural improvements: i. Modifications to gratings within Bascule Gate Piers & grating supports, j. Safety Gates inside the Bascule Gate Piers. k. Ladder and fall protection system within the Bascule Gate Piers, and l. Supports for HVAC and electrical improvements. Mechanical improvements: m. Cylinder leak repairs, n. Piping leak repairs, and o. Air handling unit, ductwork, and controls for fans added to the Bascule Gate Piers. Electrical improvements: Furnish and install all conduit, wire, support hardware, electrical distribution equipment, junction boxes, pullboxes, etc. associated with: p. Bascule Gate Pier interior lighting replacement, q. Power for Motorola audio system r. Conduit relocations for ultrasonic sensors that obstruct stop log guides at the BasculeGate Piers. s. Power for Air Handling Unit system, t. Power for Sump Pump system u. Panelboard replacement within Pier 5 v. Power for RTU/Bascule Gate Control Panel in Piers 3 and 5 Conduit system for future level instrument installation at Pier 2 Estimated Amount for Solicitation: $3,600,000.00 African American: 1.71% Hispanic American: 2.16% Native/Asian American: 1.05% WBE: 1.18% Project Related Questions: Laurie Thering (512) 974-7035 laurie.thering@austintexas.gov Solicitation Specific Questions: Alejandro Foubelo (512) 974-5636 alejandro.foubelo@austintexas.gov Small Minority Business Resources Questions: Lisa Barney (512) 974-8046 smbrcompliancedocuments@austintexas.gov Pre-bid meeting info: For those calling in, please send an email to Alejandro Foubelo - alejandro.foubelo@austintexas.gov with the subject line CLMC1032, indicate in the body of the email your name, the firm you are representing, your contact information and whether you are a prime firm or subcontractor. Please send this by 5:00 pm on the day of the virtual pre-bid meeting.

Post-Bid

Water / Sewer

$3,600,000.00

Public - City

Renovation

94

17

10

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
147
Bidding Soon
3,694
All Active Projects
1,415
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.