BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2024 at 8:00 PM

Updated April 10, 2024

Site work and paving for a bridge / tunnel in Lumber City, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For the Improvement to the Bridge in Clearfield and Centre Counties, Chester Hill and Philipsburg Boroughs, Commonwealth of Pennsylvania, Sr 2020-a01. For the Removal of the Bridge Spanning the Moshannon Creek Between the Two Counties. Work Involves Bridge Removal for a Total Construction Length of Approximately 400.50 Feet (0.076 Miles) as Indicated on the Approved Drawings Included in the Bid Package. Project Cost Range: $200,000.00 - $499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 52.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Removal Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Presqueisle Ov/Moshannon Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SR/SEC/Group ID:2020/A01/LDR

Award

Bridges / Tunnels

$108,500.00

Public - State/Provincial

Paving, Site Work

18

11

10

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
98
Bidding Soon
1,053
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 29, 2024

Project location map

SR-2020, Lumber City, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.