Site work for a water / sewer project in Omaha, Nebraska. Completed plans call for site work for a water / sewer project.

The work consists essentially of the following estimated quantities. 1 Clearing & Grubbing - General 1 LS 2 Install Construction Entrance 1 EA 3 Install Straw Wattle 351 LF 4 Install Curb Inlet Protection 2 EA 5 Install Silt Fence 566 LF 6 Excavate, Dry and Re-Compact Silt or Haul Off Site 1,025 CY 7 Excavation On-Site (Established Quantity) 358 CY 8 Excavation Haul-Off (Established Quantity) 1,151 CY 9 Remove and Replace 5" PCC 6' Wide Sidewalk 180 SF 10 Construct 54" Manhole (1) 7.5 VF 11 Construct 30" RCP, Class III 16 LF 12 Construct 42" RCP, D(0.01)=1,350 16 LF 13 Construct 42" Collar 1 EA 14 Construct 30" FES 1 EA 15 Remove and Relay 42" FES 1 EA 16 Install North American Green S150 - Type A Seed & Mat 4,233 SY 17 Install North American Green S150 - Rain Garden Mix Seed & Mat 2,353 SY 18 Install North American Green VMAX C350 - Type A Seed & Mat 184 SY 19 Construct Rip-Rap Scour Hole, Type A 77 TN 20 Construct Rip-Rap Scour Hole, Type C 54 TN Sanitary Improvement District 572 of Douglas County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities. The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, and miscellaneous costs) is $92,000.00. All proposals must be submitted on bid forms furnished by E & A Consulting Group, Inc., and must be accompanied by a bid bond or a certified check in the amount of not less than $4,600.00 made payable to the Treasurer of Sanitary and Improvement District No. 572 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor, and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders.

Award

Water / Sewer

$79,764.00

Public - City

Site Work

8

5

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
96
Bidding Soon
954
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2024

March 29, 2024

Project location map

To Be Determined, Omaha, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.