BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Schaumburg, Illinois. Contact the soliciting agency for additional information.

This project requires 33% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 25, 2024, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering services are required to perform the Quality Assurance responsibilities of Hot-Mix Asphalt (HMA), Portland cement concrete (PCC) construction, Aggregate Gradation Control System (AGCS), Recycled Asphalt Paving (RAP) testing, Recycled Asphalt Shingles (RAS) testing, pipe, precast and prestressed inspections. Services and responsibilities include structural steel and miscellaneous materials inspection at various sources or jobsites. Independent Assurance sampling and testing for the department for both HMA and PCC according to Federal guidelines at both plants and jobsites. The department may have a need for a project manager to handle certain parts or full-time tasks such as staff management of Independent Assurance efforts, RAS testing program, a geographical area for Mixtures Control Unit, evaluation and reporting of Pay Factors for End Result Projects, special laboratory testing, and evaluation of mix designs and new products, etc. The Project Manager may require appropriate training and experience for the tasks, which they are assigned. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Special Services (Quality Assurance HMA & Aggregate) Special Services (Quality Assurance PCC & Aggregate) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 10 - RFQ - Various Phase III Projects, Various Routes

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
130
Bidding Soon
2,073
All Active Projects
885
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.