BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Graham, North Carolina. Completed plans call for the renovation of a residential development.

The Owner reserves the right to reject any or all bids and to waive informalities Questions that arise from the Site Visits are to be directed to the Architect at bids@stognerarchitecture.com. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina and per Section 9 of Form 5369 and individual sureties must be listed on US Treasury Circular Number 570 to execute the contract in accordance with the bid bond and per HUD-5369 Sections 9 and 10. Five Percent shall be based on the maximum bid price, ie: Base Bid plus Unit Prices plus Contingency Allowance plus All Add Alternates. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten (10) days after the award or to give satisfactory surety as required by law. A Performance Bond and a Payment Bond will be required for one hundred percent (100%) of the contract price. Performance and Payment Bond not required if Bid is less than $100,000.00. Scope of work will consist of renovations and modernization of existing project and includes, but is not limited to, the following items Provide all other work as shown on plans, in the Project Manual and as required by Codes. The electrical contractor is responsible for patching walls and ceilings cut or damaged due to work but shall have a qualified sub-contractor provide the repairs. Prime Contractor may be a Building Contractor or an Electrical Contractor where permitted by Licensing rules. Prime Contractor shall be responsible for all work including patching of areas disturbed as a result of the work. Sheetrock shall be patched and painted by someone experienced in that type of work, patched areas shall be primed and painted two coats, extend paint 12 inches beyond the patch and blend in to existing paint.

Post-Bid

Residential Subdivision

$1,000,000.00

Public - City

Renovation

42

24

10

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
52
Bidding Soon
1,372
All Active Projects
563
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

April 26, 2024

img_map_placeholder

Multiple Locations, Graham, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.