Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 30, 2024 at 8:00 PM
Updated May 13, 2025
Site work and paving for a bridge / tunnel in Caledon East, Ontario. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
- Installation of environmental items and bird netting - Traffic control, detours, signage, and barricades - Removals and disposal of existing asphalt over deck and approaches - Excavation of earth and granular grading - Removal and replacement of concrete curb and parapet wall - Partial depth and full depth removal of bridge elements as shown in drawings - Concrete placement, deck waterproofing and concrete sealer - Dewatering for structure excavation - Hotmix asphalt paving - Pavement markings - Installation of Guiderail system and structure connection - Installation of electrical conduit for future connection Documents can be obtained at: https://caledon.bidsandtenders.ca Question Deadline: Fri Feb 23, 2024 2:00:00 PM (EST)
Award
Bridges / Tunnels
$772,950.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
