Site work for a water / sewer project in Trois-Rivieres, Quebec. Completed plans call for site work for a water / sewer project.

General description of the work for the Pier 17 Reconstruction Project and the Construction of the New Pier 16: The Pier 17 Reconstruction and New Pier 16 Construction Project is located in the central part of the Port of Trois-Rivières between Piers 19 and 13. It consists of reconstructing the seafront of Pier 17 (length approx. 242 m) which dates from the 1930s, filling an inner basin formed by the current Piers 14, 15 and 16 (surface area of approx.17,000 m2), building a new Pier 16 (length approx.121 m) which will form a continuous line between Pier 19 and Pier 13 located further east, as well as to build the infrastructure required for the replacement and modernization of the alumina and grain handling equipment of Alcoa and G3 operating in this sector of the port. The Project to be carried out includes the main works described below. Please note that the purpose of this description is only to provide a general overview of the scope of the work constituting the Project and covered by this Call for Tenders. The Call for Tenders Documents and the plans and specifications specify in detail the various works to be carried out as well as the requirements of the TRPA with regard to the completion of the Project. The work to be carried out under the Project is broadly described as follows: Construction of a new quay façade made of steel piles over a total length of approx. 365 m, including approx. 245 m in front of the existing platform 17 and approx. 120 m for the closure of the basin. These works include, in particular, the concrete caping wall, the anchor rods, the retaining structures consisting of steel sheet pile anchor walls (length ±95 m), pile retaining beams (length ±127 m) and prefabricated concrete anchor walls (length approx. 131 m), quay equipment (mooring bollards, fenders, ladders, mooring lines), the closure structure at the junction of the new platform 16 with the existing platform 13 and, if required according to the phasing of the work, the temporary closure between phases 1 and 2 of the Project, the removal of submarine piles in the front of the existing Pier 17 and the removal of existing dock equipment affected by the work (mooring guards, mooring bollards, fenders, ladders, etc.); All demolition work required for the construction of new structures (concrete and wood structures, existing networks such as drainage, water, electricity, hydrocarbon, etc.); All required excavation and backfilling work including water control, management and disposal of contaminated materials, monitoring and control of settlements; All environmental monitoring and environmental protection measures; Work to backfill the inner basin (formed by piers 16, 15 and 14) over an area of approx. 17,000 m2; Construction of the foundations of Alcoa's and G3's material handling equipment consisting of concrete structures based on a system of deep foundations on piles. These works include, but are not limited to, the linear foundations of Alcoa's PDPs (length ± 169 m), the foundations of three (3) G3 fixed loading towers, the foundations of the Alcoa and G3 handling galleries, and the foundations of the required complementary facilities; Construction of new storm drainage and water systems for new developed areas; Extension of a storm outfall of the City of Trois-Rivières through the filling of basin 16 (length approx. 165 m); Construction of electrical infrastructure in the areas affected by the work, including the lighting of Basin 16, the underground distribution networks; Earthworks and paving of the areas affected by the works (surface area approx. 32,315 m2); Modification and relocation of underground industrial pipes for the handling of liquid bulk by the Somavrac company at Pier 14. Official bid documents must be obtained from www.merx.com.

Post-Bid

Water / Sewer

$4,000,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
116
Bidding Soon
1,911
All Active Projects
782
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

June 10, 2024

img_map_placeholder

1545 Rue du Fleuve, Trois-Rivieres, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.