BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fishkill, New York. Completed plans call for site work for a water / sewer project.

Reference Number 0000342229 This Project generally consists of furnishing and installing an emergency interconnection between the existing Brinkerhoff and Merritt Park water systems, including trenched and horizontally directionally drilled water main, along with a meter/control vault. Only written Requests For Information (RFI) will be accepted. RFI's will be accepted until 4:00 p.m. (Local Time) on February 20, 2024, at the office of the Engineer to the attention of John Lazarony, PE via email: jlazarony@cplteam.com. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % -- Each bid must be accompanied by a certified bank check or bid bond from a domestic carrier licensed to do business in the State of New York in the amount of not less than five (5%) of the amount of the bid submitted. Question Deadline 02/20/2024 at 4:00 PM ET Only written Requests For Information (RFI) will be accepted at the office of the Engineer to the attention of John Lazarony, PE via email: jlazarony@cplteam.com. 1. The General Contractor shall be subject to non-payment of items for non-compliance with contract requirements for maintenance and protection of traffic, restoration of surfaces and erosion and sediment control, as outlined in Supplementary Conditions of this Contract Document. 2. This contract shall include all work set forth in the plans and specifications required to complete the improvements described. The descriptive narrative prepared for the contract has been structured to define the general work required. There is no intention, eithermimplied or otherwise, that these narratives accurately or completely list all items of work to be undertaken as part of the contract. Any necessary work which is not specifically described in the contract documents shall be included in the contract. Where used herein, the words "included" or "including" shall mean "including but not restricted to". The contract shall include all labor, material, equipment, and other expenses required to perform the work specified. Work shall be performed in accordance with all applicable permits. 3. The work will be in close proximity to existing underground utility lines, water mains, sanitary sewer mains and force mains, storm drainage structures, sanitary manholes and other structures. The Contractor shall notify all utilities at least two days prior to any excavation. The Contractor shall fully familiarize himself with all existing piping and underground facilities. The Contractor shall protect existing facilities. The Contractor shall utilize every precaution to protect such structures and utilities from any and all damage, with the understanding that all damage shall be repaired or replaced as directed by the Engineer at no additional cost to the Owner. 4. The Contractor shall provide and install all suitable signs, barricades, and other protective devices for the maintenance and protection of traffic for the proposed work. The minimum standards shall be as set forth in the Federal Highway Administration Manual of Uniform Traffic Control Devices. The Maintenance and Protection of Traffic devices shall be installed to the satisfaction of the Engineer for the duration of the Contract. All requirements of the New York State Department of Transportation must also be followed. 5. The Contractor and Subcontractors shall ensure that the work area is adequately secured with temporary fence and other safety devices whenever work is unattended in order to protect the public. 6. Temporary drives shall be furnished as necessary during construction. 7. The Contractor shall protect all existing features, utilities, or structures for the duration of the contract. The Contractor shall provide all shoring and bracing necessary to protect existing features. Damage to existing features, utilities, or structures as a result of work under this contract shall be replaced by the Contractor at no additional cost to the Owner. Items temporarily removed, with the Engineer's approval, shall be replaced in-kind upon completion of the project and to the satisfaction of the Owner. 8. All temporary easements shall be obtained by the General Contractor as necessary prior to start of work. 9. The Contractor shall provide erosion control and dewatering to the satisfaction of the Engineer for the duration of the contract. 10. All costs for 1-9 above shall be included in the appropriate bid items.

Post-Bid

Water / Sewer

$150,000.00

Public - County

Site Work

16

25

2

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
475
Active Projects
242
Bidding Soon
4,128
All Active Projects
1,891
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Fishkill, NY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.