BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2024 at 7:00 PM

Updated March 5, 2024

Site work for a water / sewer project in Hampton, Iowa. Completed plans call for site work for a water / sewer project.

The proposed work consists of removal of approximately 16,500 feet of tile removal, abandonment of 47 feet of tile, approximately 8,500 feet of 24-inch dia. tile, approximately 1,300 feet of 18-inch dia. tile, approximately 2,700 feet of 15-inch dia tile, approximately 1,700 feet of 12-inch dia. tile, approximately 1,300 feet of 10-inch dia. tile, approximately 1,100 feet of 8-inch dia. tile, concrete collars, connections, hickenbottom intakes, and other associated work.

Post-Bid

Water / Sewer

$200,000.00

Public - County

Site Work

19

7

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
86
Bidding Soon
899
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

April 4, 2024

Project location map

Multiple Locations, Hampton, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.