BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Port Arthur, Texas. Completed plans call for the renovation of a water / sewer project.

The scope of this Contract and its Documents is comprised of removing the existing eave structures, inspecting and repairing deteriorated sections of the existing roof, removing and replacing the existing shingles, adding additional fasteners between the existing decking and purlins, installing steel connections to the roof's superstructure, and supplying Texas Windstorm certification and inspection at Central Pump Station (Pump Station #5) in Port Arthur, Texas. All structural changes and repairs are to be performed in accordance with the specifications set forth in these contract documents and as detailed in the attached engineering report/exhibits from LJA Energy (Attachment 1). The client has requested a solution to the DD7 Pump Station #5 roof decking attachment issues as stated in page 7 of the TWCA FM Global Risk Report Section 10-10-001B, dated January 23, 2020. The solution set forth by FM Global entailed adding L Angle Steel to both sides of each purlin in the roofing structure. This solution presented an issue with the costly and complicated scaffolding system that would be required for installation due to the equipment arrangement inside the pump house. LJA Energy was tasked with giving the client a less complicated and more cost-effective solution, which will be presented in this calculation report. This solution includes removing/disposing of the existing shingles on the current roof, adding #10 x 4" Simpson Deck-Drive DSV WOOD Screw or engineer approved equal screws based on designated roof area, and installing new shingles. 011524 Base Bid - Project Work to Include but Not Be Limited to: Removing the Existing Eave Structures, Inspecting and Repairing Deteriorated Sections of the Entire Existing Roof Structure, Removing and Replacing the Existing Shingles, Installing Additional Fasteners as Specified, and Providing a Windstorm Certificate on the Finished Roof Structure at Central Pump Station (Pump Station #5) in Port Arthur, Texas.

Bid Results

Water / Sewer

$145,361.00

Public - County

Renovation

3

16

5

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
12
Bidding Soon
498
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

May 6, 2024

img_map_placeholder

1401 19th St, Port Arthur, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.