Site work and paving for a mixed-use development in Farmers Branch, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Deadline to Submit Questions 4/30/2024 - 5 PM City of Farmers Branch (Owner) will be requesting Statements of Qualifications from Construction Manager at Risk (CMAR) organizations (Proposers) for the construction of the following Project, and for related pre-construction and procurement CMAR services: Farmers Branch Office Park Lift Station Rehabilitation The CMAR Contract will include the following services and Work for rehabilitation of an existing lift station. The sanitary sewer lift station is located at the northwest corner of I-635 and the Dallas North Tollway in the Sheraton Hotel parking lot, adjacent to IH635. The lift station, constructed in 1985, consists of three (3) 670 gpm submersible pumps that pump sewage out of a concrete wet well and into two force mainsthat outfall as a single connection in a manhole along the IH635 service road. This project will generally include the following work: Demolition and removal of all existing electrical gear and generator. Removal of all submersible pumps (3) and wet well piping. Wet well recoating Installation of new submersible pumps (3) and related discharge piping, and valve vault Electrical installation of underground electrical, power and control conduit and wiring. Installation of owner furnished emergency generator. Civil site work including grading and paving, electrical and generator pads, concrete access drive, masonry fence and access gates. Landscape architectural element including new masonry fence, access gates, cover awnings for electrical gear, and landscaping and irrigation. Owner anticipates that the CMAR's Contract Price will be approximately $1,400,000. The CMAR Contract has an expected start date second quarter of 2024 and duration for construction of 9-10 months.

Post-Bid

Water / Sewer

$1,400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
64
Bidding Soon
3,517
All Active Projects
1,396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

June 15, 2024

img_map_placeholder

I-635, Farmers Branch, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.