BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 12, 2026 at 8:00 PM

Updated March 18, 2026

Site work, paving and new construction of a mixed-use development in San Antonio, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a 8,800-square-foot, one-story above grade clubhouse / community center; and clubhouse / community center.

The Capital Delivery Department will solicit a Request for Competitive Sealed Proposals (RFCSP) seeking one firm to provide construction services for the new construction of the Kenwood Community Center in District 1. The Kenwood Community Center project is an 8,800 SF new construction located at 305 Dora Street, on the site of the former Senior Center (demolished in 2024). The project consists of a one-story building. Construction methods and materials include, but are not limited to, a concrete foundation, crawl space, steel framing, masonry veneer, pre-finished metal panels, a standing-seam metal roof, and aluminum storefront windows. Interior spaces include classrooms, offices, fitness area, bathrooms, and a warming kitchen. Typical finishes include, but are not limited to, polished concrete, carpet tile, and luxury vinyl tile flooring; gypsum walls with select tile areas; and acoustical tile and gypsum board ceilings. Site work includes selective demolition and reconstruction of entrances, sidewalks, ramps, and the parking lot to improve accessibility at the site. The parking lot is existing and will need to be protected during construction. New fences, dumpster enclosures, and retaining walls are featured. Question Deadline 03/06/2026 at 4:00 PM CT Respondent must submit questions concerning this RFCSP through the CivCast website at online *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Post-Bid

Clubhouse / Community Centers

$6,005,000.00

Public - City

New Construction, Paving, Site Work

161

54

42

2

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
3
Bidding Soon
1,310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

May 18, 2026

Project location map

305 Dora St, San Antonio, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.