BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chapel Hill, North Carolina. Conceptual plans call for the renovation of a educational facility.

Bingham Facility Generators supporting Building A and Building 2 were installed in approximately 1987 and 2007 respectively. The generator serving Building A is a 125kW generator at 208Y/120V. The generator serving Building 2 is a 125kW generator at 480Y277V. This project will replace the existing generators with a single 400kW, 480Y/277V generator station, remove the existing day tank and buried piping, and install electrical distribution to accommodate the new generator station. This project has been approved by the UNC-Chapel Hill Board of Trustees. A total project cost of $820,000 is targeted. The project delivery method will be Single Prime bid & contract. The design team shall: Assist in coordination of University stakeholders, such as, the Department of Facilities Planning + Design, Construction Management, Facilities Engineering, Energy Services, Information Technology Services, and other University support services. Participate in land entitlement process with Town of Chapel Hill Prepare designs including Cost Analysis of multiple options. All contract documents shall be in compliance with provisions regarding the NC Building Codes. Respond to comments as part of the State Construction Office review process for Capital Planning Projects. Prepare Cost Estimates, Project Schedules, Phasing Plans (as may be necessary), and Concept Renderings for the project. The University expects prospective design teams and the individuals identified as members of those teams to have demonstrated experience in successfully delivering projects of a similar type and size. Design proposals should include a comprehensive listing of all consultants, including architectural, and others needed to address the specific needs of this project. The design team must also demonstrate the ability to design facilities that are sympathetic to the existing campus context considering the campus design guidelines. Selection Committees Short List Recommendations 2/29/2024 Interviews 3/6/2024 Board of Trustees Approval 3/28/2024 Execute Design Agreement April 2024 A Selection Committee will convene on date listed in the table above to discuss the Design Teams proposals and determine a short list for interviews. The Project Manager will then notify all teams as to the short-listed firms and schedule for interviews. Designer Interviews will be scheduled for the date listed in the table above. The format of the virtual (Zoom) interview will consist of a 30-minute presentation by the design team that is followed by a 15-minute question and answer session. Each design team is expected to have present the person(s) from their firm(s) who will be responsible for leading the execution of this project. Zoom meeting details will be provided at the time of notification of shortlisting. Following the interviews, the Selection Committee will issue recommendations, in priority order, for the selection of the design team. This list will be presented on date listed in the table above to the University's Board of Trustees for approval. Please contact only the individual listed below for any matters related to this submittal. No other University staff, The Universitys Board of Trustees, or any university officials is to be contacted. All questions and project submittals shall be directed to: Kyle Hawkins Project Manager UNC Facilities Planning and Design wkhawkin@unc.edu The University of North Carolina at Chapel Hill seeks letters of interest from firms who have recent experience with similar projects. Please format all proposals utilizing an SF-330 format. The submittal must include descriptions of (based on 01 NCAC 30J .0303 SELECTING CRITERIA): 1. Specialized or Appropriate Expertise in the type of project. 2. Past Performance on similar projects. 3. Adequate staff and Proposed Design & Consultant Team for the project 4. Current Workload and State Projects awarded. 5. Proposed Design Approach for the project including design team and consultants. 6. Recent experience with Project Costs and Schedules. 7. Construction Administration capabilities. 8. Proximity to and familiarity with the area where project is located. 9. Record of successfully completed projects without major legal or technical problems. 10. Historically Underutilized Business (HUB) participation & utilization in proposed team structure; and who/how HUB designers were utilized on previous projects. 11. The team's recent experience with the NC State Construction Office (SCO). 12. Include current SF-330 Part II of lead firm and each proposed consultant. 13. Include information regarding lead firm's current license to practice in the State of North Carolina To fairly evaluate the submittals and to better utilize the Selection Committee's review time, we request that only pertinent information relating to the specific selection criteria listed above be provided in Section H of the SF-330 formatted submittal. UNC-CH does not limit the quantity of pages for proposals. The method of Contractor Selection has not been Determined at this time.

Conceptual

Educational

$820,000.00

Public - State/Provincial

Renovation

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
89
Bidding Soon
1,805
All Active Projects
734
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 21, 2025

img_map_placeholder

To Be Determined, Chapel Hill, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.