Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 15, 2024 at 7:00 PM

Updated February 24, 2024

Site work for a service station / car wash facility in Kiawah Island, South Carolina. Completed plans call for site work for a service station / car wash facility.

The Town of Kiawah Island hereby requests proposals from qualified firms to install four (4) Blink Electric Vehicle (EV) charging stations at the Town of Kiawah Municipal Center Complex located at 4475 Betsy Kerrison Parkway, Kiawah Island, SC 29455. Project Location: Town of Kiawah Island The proposed work in this Request for Proposal (RFP) will include the following: installation drawings and schematics, line items of all materials, cost of civil asphalt work, EV charging signage with striping, bollards and foundation, project phases, and project timeline. The Town will: A. Supply the Blink Series 7+ Dual Port EV Chargers with the installation manual. The contractor will: A. Civil engineering and construction of parking space expansion. B. Connect charging infrastructure with our 200kw Cummins generator. C. Supply all materials and labor for the installation. D. Future proof by "make ready" for two additional dual port chargers in the other four parking spaces supplying and installing conduit and foundation. E. Provide 24-hour service and maintenance contracts for guaranteed uptime For questions or additional information, please contact Michael Nardelli, Assistant Operations Manager, by calling 843-806-8108 or by email at mnardelli@kiawahisland.org. No questions or requests will be accepted after February 19, 2024.

Post-Bid

Service Station / Car Wash

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

March 25, 2024

Project location map

Multiple Locations, Kiawah Island, SC

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed