EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 23, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Delran, New Jersey. Completed plans call for site work for a water / sewer project.

The work under this proposal shall include the furnishing of all labor, material and equipment necessary to perform the work as shown on the Contract Drawings and as specified. All construction shall be included in a single overall Contract. The Contract generally consists of replacing approximately 2,799 LF of existing 16-inch diameter ACP sanitary sewer with new 18" high density polyethylene (HDPE) pipe by trenchless installation (pipe bursting), installation of precast sanitary sewer manholes, replacement of sewer laterals, site restoration, and all other work in accordance with the Contract Documents. Each Bid shall be accompanied by Bid security consisting of either a Bid Bond, cashier's check or a certified check made payable to the Township of Delran and in the amount of ten percent (10%) of the Bid price, but not to exceed $20,000.00. Such checks or Bid Bonds will be returned to all except the three apparent lowest responsible bidders, unless otherwise requested, within ten (10) working days after the opening of Bids and the proposals of such bidders shall be considered as withdrawn. The checks or Bid Bonds of the remaining unsuccessful bidders shall be returned within three (3) days after the awarding and signing of the Contract and the approval of the accepted Bidder's Performance Bond, or if no award will be made. Each Bid must also be accompanied by a certificate of Consent of Surety from a Bonding Company licensed to do business in the State of New Jersey and named in the current list of "Surety Companies Acceptable on Federal Bonds", U.S. Treasury Department, for the furnishing of Bonds as hereafter described. A Performance Bond and a Labor and Materials Payment Bond for one-hundred percent (100%) of the Contract Price, issued by a company authorized to do business in the State of New Jersey, will be required for the faithful performance of the Contract. The Township of Delran reserves the right to reject any or all Bids and also reserves the right to waive any informality in the Bids and to accept the Bid which, in its judgment, best serves the interest of the Township of Delran. The number of days allowed for the completion of the contract shall be 150 calendar days. Each proposal must be submitted in writing on the proposal pages furnished in the Contract Documents; this entire document must be submitted at the time of bid. Bids may be hand-delivered or submitted by mail. However, firms choosing to submit their bids via "United States" mail, Federal Express, UPS, messenger service, etc., are required to have such mail delivered prior to the specified bid opening time. No bids will be received after the time specified. Though the Township of Delran will accept bids received by mail or other courier services, all bids shall be properly labeled with the name and time of the bid on the outside of the delivered package, and the Township of Delran takes no responsibility for the loss, non-delivery, late delivery or physical condition of the bids so sent. The Township of Delran will accept only original and originally executed bidding documents. Photocopies or telefax copies of such documents will not be accepted in lieu of originals. The successful Bidder shall be required to comply with the provisions of the New Jersey Prevailing Wage Act, Chapter 150 of the Laws of 1963, effective January 1, 1964. Document note: Contract Documents for the proposed work prepared by Keith Chiaravallo, P.E., Consulting Engineer, CME Associates, may be examined at the office of said Engineer, at 3141 Bordentown Avenue, Parlin, New Jersey or at the Township of Delran at the aforementioned address between the hours of 9:00 a.m. and 4:00 p.m. Contract Documents may be obtained by contacting the office of the Engineer until 48 hours prior to the time set for the opening of bids. Electronic copies of the Contract Documents may be obtained at no charge during normal business hours by emailing a request to Corey Chonko (cchonko@cmeusa1.com) or Brandon Auerbach (bauerbach@cmeusa1.com) with the subject heading "Request for plans - Route 130 Sanitary Sewer Improvements".

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

18

13

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Embankments, Roadway Embankments, Shoring and Underpinning, Concrete Raising, Pressure Grouting
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Culverts, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
481
Active Projects
277
Bidding Soon
4,543
All Active Projects
1,939
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

March 25, 2024

img_map_placeholder

US-130, Delran, NJ


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Route 130 Sanitary Sewer Improvements Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.