Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Athens, West Virginia. Completed plans call for the renovation of a educational facility.
The Owner reserves the right to conduct such investigation as necessary to determine the responsibility of a bidder, and to the extent permitted by state law; Concord University reserves the right to reject any and all bids, and to make selections from the bids that are solely in the best interest of Concord University. All bids must be accompanied by a Bid Bond, executed by the Bidder and an acceptable Surety, in an amount equal to 5% of the bid. The successful bidder will be required to furnish and pay for a 100% Performance and Material Payment Bond in the amount of the bid (including all add alternates), as described in the Instructions to Bidders. Each bidder shall ensure that all employees and applicants for employment are not discriminated against because of race, creed, color, sex, or national origin. All bids must be accompanied by a Bid Bond, executed by the Bidder and an acceptable Surety, in an amount equal to 5% of the bid. The successful bidder will be required to furnish and pay for a 100% Performance and Material Payment Bond in the amount of the bid (including all add alternates), as described in the Instructions to Bidders. Each bidder shall ensure that all employees and applicants for employment are not discriminated against because of race, creed, color, sex, or national origin. A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work prior to agreement on adjustment, if any, in the Contract Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions, or other revisions, the Contract Sum and Contract Time being adjusted accordingly. The Contractor shall review every specification to fully ascertain the scope of its Work containedtherein. Any modifications made necessary as a result of such document coordination shall be brought to the attention of the Architect/Engineer immediately for resolution. Extensions of Contract time or price shall not be granted when such document coordination did not take place. General Conditions, Supplementary General Conditions and Division 1 of these specifications govern all work hereunder. The work described in this section includes restoration of any areas or site features, not designated as "to be removed," that are damaged by construction activities during the course of the execution of the contract. The work may include such repairs as turf and landscape renovation or replacement, and soil preparation such as may be necessary to return the site to an "as good as" or "better than" existing conditions. The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site. The Contractor shall be entitled to rely on the accuracy of information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work This Section includes administrative and procedural requirements governing the Contractor's selection of products for use in the Project The deadline for questions is Wednesday, 2/28/2024 by 5pm.
Post-Bid
Educational
$200,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2024
April 8, 2024
1000 Vermillion St, Athens, WV
Related To This Project
Athens, WV
Bid Date: Apr 05 2024
Athens, WV
Bid Date: Jun 12 2024
Athens, WV
Bid Date: Jun 20 2024
Athens, WV
Bid Date: Sep 17 2024
Athens, WV
Bid Date: Nov 13 2024
Athens, WV
Bid Date: Mar 12 2024
Athens, WV
Bid Date: Nov 06 2023
Athens, WV
Bid Date: Nov 06 2023
Athens, WV
Bid Date: Jun 15 2022
Athens, WV
--
Athens, WV
--
Athens, WV
Bid Date: Sep 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.