BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work, paving and renovation of a mixed-use development in Gardena, California. Completed plans call for the renovation of a stadium; for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project upgrades the football stadium and track including the following work: 1) Temporary Staff Parking, to be completed within the first 45 days after NTP. This area shall be restored to its original function before the project's Substantial Completion. 2) Removal/demolition of existing Ticket Booth. 3) Verification of the topographic survey included in the Construction Documents, to be completed within the first 90 days after NTP. 4) New synthetic all-weather track to replace the existing decomposed granite track. 5) New field event facilities for long jump, triple jump, and high jump. 6) Improvements to the existing shot-put area. 7) New natural grass football/soccer field with irrigation and drainage. 8) New stadium bleachers for the home side with capacity of approximately 3,600 seats. 9) New stadium bleachers for the visitor side with capacity of approximately 1,900 seats. 10) New Press box and sound system. 11) New scoreboard, football field goal posts, fencing, and gates. 12) Site improvements including: I. Exterior painting and interior finish for the home side restrooms/concessions building. II. Exterior painting and interior finish for the visitor side restrooms/concessions building. III. Associated upgrades including: i. Landscape. ii. Hardscape. iii. Infrastructure. iv. ADA accessibility upgrades, including concrete paving replacements throughout the site and restroom modifications at the Main Gym and at the Practice Gym. 13) Requirements from the Americans with Disabilities Act (ADA), Division of the State Architect (DSA), Department of Toxic Substances Control (DTSC), and other improvements to ensure compliance with local, state and federal requirements. Question Deadline 02/24/2026. The District's Contract Bond Estimate is $22,696,000.00.

GC Bidding

Arenas / Stadiums

$25,680,000.00

Public - County

Paving, Renovation, Site Work

5

12

2

2

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
552
Active Projects
277
Bidding Soon
3,800
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

April 6, 2026

Project location map

1301 W 182nd St, Gardena, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.