BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Sanford, Florida. Working plans call for the renovation of a residential development.

Bid is canceled. Question Submission Deadline:March 4, 2024, 5:00pm The purpose of this IFB is to establish a service contract with a certified Electrical contractor in the State of Florida who shall provide Electrical and related work for Seminole County (County) in a reliable and timely manner. The Contractor shall have the capability to service multiple locations throughout Seminole County at any given time. The majority of work under this contract will be electrical replacement work for residential properties. The County reserves the right to make multiple awards in the best interest of the County. The Contractor shall provide all permits, labor, material, supplies, transportation, insurance, incidentals and equipment to repair, replace or install electrical work in residential properties. The scope of work may include, but is not limited to: General maintenance, repair, or replacement of existing residential wiring systems; Location and repair or replacement of faulty wiring; Panel upgrades and repairs; Troubleshooting and testing; Wiring; Electrical installation and repairs; Remove and replace/repair breakers; Replace or repair electrical outlets, fuses; Replace or replace sensor switches, exhaust fans, ceiling fans; Replace or repair junction boxes, covers; Provision and installation of conduit, wiring, junction box, electrical fixtures, and electrical service equipment to repair or replace existing installations; Repair or replacement of electrical equipment, conduits, and other equipment; Complete revision of a residential building's electrical system. If Contractor does not submit a quote for a particular job, the Contractor must submit a "no quote" and the reason for no bidding the job. If Contractor declines to submit a quote to the County five (5) times or more within a year period, the County might terminate the Agreement. Any questions concerning the intent, meaning and interpretations of the IFB documents including the attached Draft Agreement, shall be requested in writing, and received no later than Written requests shall be submitted via the COUNTYS e-Procurement Portal The COUNTY will not be responsible for oral instructions made by employees of the COUNTY or its authorized representatives in regard to this IFB.

Final Planning

Residential Subdivision

$124,600.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
163
Bidding Soon
2,420
All Active Projects
982
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 13, 2024

September 13, 2024

img_map_placeholder

Multiple Locations, Sanford, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.