Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 5, 2024 at 8:00 PM
Updated April 6, 2024
Site work and paving for a mixed-use development in Morton, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
**As of March 5, 2024 project was awarded to Howell Paving, awarded amount is $939,388.52.** City/County - Flora Bituminous Materials (Tack Coat) = 13,777 Pounds HMA Surface Removal - Butt Joint = 177 SY Longitudinal Joint Sealant = 11,880 FT HMA Binder Course, IL 9.5FG, N70 = 1,325 TON HMA Surface Course, Mic "C", N70 = 1,590 TON HMA Incidental Surfacing = 221 TON HMA Surface Removal, 2 1/2" = 20,155 SY Temporary Ramp = 96 SY Base Course Removal (Special) = 37 SY Sidewalk Removal = 2,773 SF Combination Curb & Gutter Removal = 326 FT Removing Inlets = 1 EA Manholes to be Adjusted = 16 EA Valve Boxes to be Adjusted = 7 EA PCC Sidewalk 4" = 3,085 SF PCC Base Course 7" = 37 SY Combination Curb & Gutter Ty B-6.12 = 326 FT Detectable Warnings = 309 SF Inlet, Type A w Type 11 Frame & Grate = 1 EA Storm Sewers, CL B, Type 1 12" = 10 FT Trench Backfill = 5 TON Short Term Pavement Marking = 1,300 FT Short Term Pavement Marking Removal = 215 SF Thermoplastic Pavement Marking 4" = 2,180 FT Thermoplastic Pavement Marking 12" = 30 FT Thermoplastic Pavement Marking 24" = 24 FT Thermoplastic Pavement Marking Letters & Symbols = 90 SF Relocate Existing Signs = 15 EA Mobilization = 1 LS TCP (Special) = 1 LS TCP Standard 701201 = 1 LS TCP Standard 701306 = 1 LS TCP Standard 701501 = 1 LS TCP Standard 701801 = 1 LS Seeding, CL 1 (Special) = 0.1 Acre Project Location: Main Street Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT - Bituminous Materials (Tack Coat), HMA Surface Removal - 22-00065-00-RS
Award
Roads / Highways
$939,388.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 22, 2024
March 25, 2024
Main St, Morton, IL
Related To This Project
Morton, IL
Bid Date: Mar 12 2024
Morton, IL
Bid Date: Mar 14 2024
Morton, IL
Bid Date: Mar 14 2024
Morton, IL
Bid Date: Mar 20 2024
Morton, IL
Bid Date: Mar 19 2024
Morton, IL
Bid Date: Mar 19 2024
Morton, IL
Bid Date: Mar 28 2024
Morton, IL
Bid Date: Mar 08 2024
Morton, IL
Bid Date: Jan 30 2024
Morton, IL
Bid Date: Jan 19 2024
Morton, IL
Bid Date: Jan 19 2024
Morton, IL
Bid Date: Jan 19 2024
Morton, IL
Bid Date: Jan 19 2024
Morton, IL
Bid Date: Dec 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
